Search Documents

  • IMPC
    Using DEM to Model Ore Breakage within a Pilot Scale Sag Mill

    By Rob D. Morrision, Paul W. Cleary

    "The best accepted method for design of autogenous and semi-autogenous mills is to carry out pilot scale test work using a 1.8 m diameter by 0.6 m long pilot scale test mill. The load in such a mill t

    Jan 1, 2003

  • IMPC
    Froth Stability and Flotation Performance

    By Jan J. Cilliers, Nicolas Barbian, Esther Ventura-Medina

    "Froth structure and stability are known to play an important role in determining flotation recovery and selectivity. An industrial sampling campaign was performed to develop a clearer understanding o

    Jan 1, 2003

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • RMCMI
  • IMPC
    Zinc Oxide Flotatoin Process Using CPS Technique

    By J. Tian

    "BHP Billiton carried out a pre-feasibility study on the LanPing zinc deposit to evaluate the possibility to jointly develop the zinc deposit into a large-scale zinc project with their Chinese partner

    Jan 1, 2003

  • NIOSH
    RI 6210 Effects Of Water Injection On Oil Recovery In Cooke And Grayson Counties, Tex.

    By Frank Parrish

    History and performance data of 17 water-injection projects in Cooke and Grayson Counties in north Texas are presented for the purpose of studying and comparing operating practices and oil-recovery te

    Jan 1, 1963

  • SME
    Gold Recovery From High-Arsenic Containing Ores At Newmont´s Roasters

    By R. Fernández, E. Marczak, A. Collins

    Newmont roasting plant in Carlin, Nevada commenced operating in December 1994. Over the years, refractory ores and pyrite concentrates from different gold deposits constituted the feed to the facilit

    Jan 1, 2007

  • CIM
    Contaminant Problems in Agrium’s Canadian Phosphate Business

    By Julie Culverhouse, Dennis Grimm, Kieran Harding, Jean-Francois Boulanger

    "Agrium’s Canadian Phosphate Business (CPB) is comprised of Kapuskasing Phosphate Operations (KPO) in Northern Ontario, Canada’s only operating phosphate mine, and Redwater Phosphate Operations (RPO)

    Jan 1, 2011

  • SAIMM
    The Application Of Numerical Modelling To The Design Of Electric Furnaces

    By T. Plikas, L. H. Gunnewiek, L. Oshinowo

    Electric furnace smelting is one of the principal unit operations for ferroalloy production, and increased process intensity, improved availability, minimal maintenance and a lon

    Jan 1, 2004

  • SME
    Comparing Simulated And Interpreted Geologic Models

    By M. Rossi

    Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft

    Jan 1, 2004

  • SME
    Pumping and Drainage

    By Christopher J. Bise

    INTRODUCTION The control of nuisance water in a mine is extremely important; left uncontrolled, nuisance water can have a severe effect on haulage, ventilation, production, and the health and safe

    Jan 1, 1986

  • DFI
    The Seven Steps To Foundation Retrofit

    By Javier Rodriguez

    Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves

    Jan 1, 2006

  • SAIMM
    Presidential Address: Collaboration and Diversity in STEM

    By Z. Botha

    Sheryl Sandberg, the COO of Facebook, published a book titled 'Lean In', where she invites women to sit at the table. In summary, to 'sit at the table' entails not only embracing opportunity, but to a

    Sep 1, 2022

  • IMPC
    Measuring the Resistivity of Titanium Minerals in a Corona Field (40c01edc-ab2e-46a3-b780-08ab00456749)

    By Peter N. Holtham, Mary M. Ng

    "Resistivity measurements of minerals in the laboratory are commonly made with a low DC voltage source. Common test voltages specified in the ASTM Standard D257 are 100, 250, 500, 1000, 2500, 5000, 10

    Jan 1, 2003

  • SME
    Sustainability For Nature And Mankind

    By M. Javier

    Defining the concept of sustainability is an important step for industry and society. It is necessary in order to clarify what it means when debunking the many misinterpretations pervasive in differe

    Jan 1, 2012

  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • DFI
    Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels

    There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration

    Jan 1, 2005

  • NIOSH
    IC 7458 Transportation of Iron Ore, Open Cut Mines, Lake Superior District

    By Frank E. Cash, John A. Johnson

    "INTRODUCTION During the 6-year period, 1940-45, 481,485,000 gross tons of iron ore was shipped from the Minnesota, Michigan, and Wisconsin mines of the Lake Superior district. Approximately 367,000,0

    May 1, 1948

  • SAIMM
    Greenhouse Gas Emissions From Ferroalloy Production

    By S. E. Olsen, T. Færden, G. Tranell, T. Lindstad, J. Lubetsky

    The authors are lead authors for chapter 4.3 ?Emissions from Ferroalloy Production? in ?2006 IPCC Guide-lines for National Greenhouse Gas Inventories, Volume 3?. The paper discusses the methods to

    Jan 1, 2007

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005