Search Documents

  • IMMS
    Observation And Sampling Of Seamount Ferromanganese Crusts With A Remotely Operated Vehicle (ROV): Advantages For Geochemical And Geological Characterization

    By Akira Usui

    The details in small-scale variability of the geological occurrence and chemical composition of ferromanganese crusts are not yet well understood, although the northwestern Pacific seamounts are belie

    Jan 1, 2011

  • CIM
    Dense Medium Separation – An Effective and Robust Pre-Concentration Technology

    By Erin Legault Seguin, Mike Rylatt, Curtis Mohns

    "With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce

    Jan 1, 2016

  • IIMP
    Sistema de control. Supervisor experto para el manejo de gases

    By Jorge Meza

    Uno de los objetivos principales del proyecto de la modernización de la Fundición SPCC es capturar y procesar el gas generado de la reacción exotérmica del proceso de fusión de los sulfuros del conce

    Sep 19, 2006

  • NIOSH
    RI 6126 Use Of A Large-Diameter Reactor In Synthesizing Pipeline Gas And Gasoline By The Hot-Gas-Recycle Process

    By A. J. Forney

    The hot-gas-recycle process, for the hydrogenation of carbon monoxide, was investigated in a 12-inch-diameter reactor. Initially because the distribution of gas was poor, hotspots developed in the cat

    Jan 1, 1962

  • CIM
    Sidbec-Normines Inc. et la Production de Boulettes à basse Teneur en Silice et de Boulettes a Hauts Fourneaux à Port-Cartier

    By Réjean Lévesque

    SIDBEC-NORMINES a été incorporée en 1976. Depuis la fin de 1977, ses activités comprennent outre la concentration au lac Jeannine, près de Gagnon, du minerai de fer extrait du gisement du lac Fire, I&

    Jan 1, 1979

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • ISEE
    Deformation of An Explosively Driven Flat Metallic Flyer During Projection

    By Seokbin Lim

    In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an

    Jan 1, 2010

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • SME
    Amax Uses Practical Approach to Dewatering at Its Sleeper Mine

    By W. David Tyler

    Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan

    Jan 1, 1991

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • CIM
    Particle Bee Algorithm for Tower Cranes Layout With Materials Quantity Supply and Demand Optimization

    By L. C. Lien

    Tower crane layout (TCL) is a typical construction site layout (CSL) problem, which is suitable for a wide range of work assignments and site conditions. Tower crane is one of the key facilities for v

    Aug 1, 2013

  • ISEE
    Evaluating Airblast Damage Complaints

    By Lawrence W. Gubbe

    Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most

    Jan 1, 2004

  • AIME
  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • RMCMI
    Highwall and Spoils Design and Monitoring

    By Tim Peterson

    Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength

    Jan 1, 2004

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • ISEE
    Pressures on Targets from Buried Explosions

    By L C. Taylor, H U. Lesiste

    This is a preliminary study of the statistical variation of the pressures on a target above a buried explosion. The data were taken at various distances from the charge centerline for three heights of

    Jan 1, 2010

  • SME
    Challenges in undertaking inertisation of fires in underground mines

    By A. D. S. Gillies

    Inertisation is used to enhance the safety of underground mine areas either to avoid the potential for a combustion event or to stabilize a situation after an ignition, fire or heating. The primary ob

    Jan 1, 2009