Search Documents

  • SAIMM
    Slope modification of open pit wall using a genetic algorithm?case study: southern wall of the 6th Golbini Jajarmbauxite mine - Synopsis

    By K. Goshtasbi

    In this paper a genetic algorithm is used in a heavily jointed rock mass in order to investigate the critical circular slip surface and modification of slope surface. This method was applied to the so

    Jan 1, 2008

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • SME
    Moving Forward on New York’s Second Avenue Subway

    By David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh

    This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists

    Jan 1, 2007

  • NIOSH
    IC 7112 Mining Of Feldspar And Associated Minerals In The Southern Black Hills Of South Dakota ? Introduction

    By Jos. R. Guiteras

    This paper is one of r series published by the Bureau of Mines dealing with the mineral resources of western South Dakota. The mining of pegmatite minerals is described mainly from the standpoint of t

    Jan 1, 1940

  • AUSIMM
    Hourly Ownership and Operating Cost Projection - Rubber Tyred Loaders

    Underground equipment owners and users in order to compete and succeed in being viable business propositions must continually balance costs with productivity. By reducing their hourly ownership, ope

    Jan 1, 1990

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • AUSIMM
    Coking with a Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of 7 cu. ft. capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidirectional

    Jan 1, 1970

  • AUSIMM
    Battery Grade Manganese Dioxide From Risdon Anode Mud

    A process was developed to produce electrolytic manganese dioxide, suitable for use in high quality dry cells, from Risdon anode mud. ImpurItIes present In the anode mud were removed prior to the elec

    Jan 1, 1968

  • AUSIMM
    Paper No. 128. The Rise And Fall of Dry Crushing on The Hauraki Goldfield.

    n the early days of the Hauraki goldfield (1866 to 1889) almost the only system of ore treatment was wet crushing followed by copper plate amalgamation. A further saving of bullion was in most cases o

    Jan 1, 1903

  • AUSIMM
    New Ideas on Gippsland Basin Regional Tectonics

    By Colwell J. B, Constantine A. E

    A unique, regional grid of deep (12 - 14 second record length), seismic reflection and refraction data has been recorded by the Australian Bureau of Mineral Resources (BMR) across the offshore Gipps

    Jan 1, 1992

  • SAIMM
    Putting Beach Slope Prediction Into Perspective - Synopsis

    By R. J. Jewell

    The storage capacity of any given tailings storage facility (TSF) is a function of the volume available for the tailings, for which the geometry of the final upper surface of the tailings is most impo

    Jan 1, 2012

  • AUSIMM
    Operating Experiences with the High Pressure Gas Pipeline from Morwell to Melbourne

    The construction of the pipeline was completed in June 1956 and the line placed into operation in December 1956, ie. it has now been in continuous operation for approximately three years under an oper

    Jan 1, 1960

  • AUSIMM
    No. 2 Open Hearth Plant at Port Kembla

    By Edmonds W, Jeffcoat R

    The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives

    Jan 1, 1957

  • SME
    Precious Metals Economics

    By Paul Sarnoff

    The economics of precious metals -- depending upon who is involved --could be the economics of hope, of fear, indeed of profit and perhaps survival. For those investors seeking capital gains in a puzz

    Jan 1, 1981

  • SAIMM
    Use of Geostatistical Bayesian Updating to Integrate Airborne Radiometrics and Soil Geochemistry to Improve Mapping for Mineral Exploration

    By J. M. McKinley

    Mineral exploration programmes around the world use data from remote sensing, geophysics, and direct sampling. On a regional scale, the combination of airborne geophysics and ground-based geochemical

    Jan 1, 2014

  • SAIMM
    Support system performance under different corrosion conditions - Synopsis

    This paper reports on recent field observations on the performance of support systems under different corrosion environments in Canadian underground mines. Phenomenological data are used to gain a bet

    Jan 1, 2008

  • IIMP
    Cierre de minas en minería a tajo abierto: Experiencias de cierre progresivo en botaderos de desmonte

    By Ezequiel Pomachagua Quijada

    En el Perú, el cierre de yacimientos es una etapa nueva de la vida productiva minera, pues a partir del año 2005 la norma rige y se les otorga un plazo de un año para elaborar y lograr la aprobación d

    Aug 1, 2015

  • AUSIMM
    An Example of Low Working Costs

    THE following brief paper is submitted with a view to encouraging the exploitation of hitherto neglected 10w~ grade ore-bodies which are suitable for extraction by open-cut methods.The Corinthian Nort

    Jan 1, 1915

  • SME
    La Ciénega – A New Gold Mine in Mexico

    By F. Grajales Muñoz

    The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.

    Jan 1, 1994