Search Documents

  • AUSIMM
    Aqueous Oxidation of Arsenopyrite in Acid

    By Linge HG, Fernandez PG, Hughes HC

    Aqueous oxidation is a possible alternative to roasting for the processing of gold bearing arsenopyrite (FeAsS) concentrates. The reaction has been studied by voltammetry and this has shown, for th

    Jan 1, 1989

  • SME-ICGCM
    An Application Of Energy Release Rate

    By Morgan M. Sears

    In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation

    Jan 1, 2009

  • SME
    Nutley Quarry Trunk Sewer Project

    By Michael V. Mergentime, Prakash M. Donde

    The Nutley Quarry Trunk Sewer Project is a good example of a tunnel that went through difficult and complex ground. The 2 m (7ft.) diameter and 840 m (2,750 ft.)long tunnel passed through soft ground,

    Jan 1, 2001

  • SME
    Measuring Carbon Emissions From Base Metal Mine Sites

    By M. J. Farrell

    The threat of global warming and its prominent position in public discussion and political debate requires all industry to take stock of its contribution to rising atmospheric concentration of greenho

    Jan 1, 2009

  • NIOSH
    In Situ Measurement Of Rock Stress With Hydraulic Borehole Pressure Cells ? Objective

    Develop a new technique of in situ rock stress measurement which can be used when and where the conventional methods, such as the overcoring stress relief methods and the hydrofracturing method, canno

    Jan 1, 1988

  • AUSIMM
    Ion Exchange Processes in the Atomic Industry

    In general, the metallurgical industry has so far been slower than the chemical industry to adopt ion exchange materials for industrial processes. The atomic energy industry presents a marked exceptio

    Jan 1, 1961

  • AUSIMM
    The Effects of Environment on Bacterial Leaching Rates

    Further evidence is presented as to the widespread occurrence of Thiobacillus ferrooxidans in nature in association with sulphide minerals. Leaching rates are discussed in terms of the effect of envir

    Jan 1, 1968

  • SME
    Cemented Rock Fill System Design And Application In Leeville Underground Mine

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500

    Jan 1, 2011

  • SAIMM
    What Is The Best Energy-Delivery System For Hand-Held Stope Drilling And Associated Equipment In Narrow-Reef Hard Rock Mines? ? Synopsis

    By P. J. Petit

    Changing mining conditions, legislative issues, rising costs, and the constrained supply of skills and electricity in South Africa, have been some of the criteria forcing mine operators and engineers

    Jan 1, 2013

  • IOM3
    Analysis of pillar design practices and techniqes for U.S. limestone mines

    By A. T. Iannacchione

    Underground mining of stone in the US is increasing, as is the depth of overburden above the mines. Data gathered from mine visits, maps, discussion with operators and numerical simulation have been u

    Jun 21, 1905

  • SME
    Integrating Research and Development in E&C Firms

    By Roshan B. Bhappu

    Integrating a research and development department into an engineering company's corporate structure can be rewarding to the engineering division, the R&D group, and, most of all, the company&apos

    Jan 10, 1980

  • AUSIMM
    Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms

    A major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A n

    Dec 6, 2010

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004

  • SME
    Conversion Of A Tailing Impoundment To A Freshwater Reservoir, The Eagle Park Reservoir Project, Climax Mine, Colorado

    By J. L. Cupp, R. C. Ford, B. R. Romig

    The Climax Molybdenum Mine, located near Leadville, Colorado, is the site of a lengthy mining history spanning more than 80 years. In the 1960’s, extraction of molybdenum from oxide ore located adjac

    Jan 1, 1999

  • AUSIMM
    Debt Finance: The Technical Factors

    The key to the successful debt funding of a new mining project, whether in economically established or developing nations, is the submission of a comprehensive feasibility study. The feasibility stud

    Jan 1, 1995

  • AUSIMM
    The Crushing and Conveying Operation at the Martha Mine

    In November 1999 Waihi Gold Mining Company commissioned its new crushing and conveying plant used to transport both ore and waste from the Martha Mine to its ore processing plant and also its tailings

    Jan 1, 2001

  • SME
    Design of Rock Shafts Adjacent to Heavily Loaded Columns

    By Nikolas K. Sokol

    Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s

    Jan 1, 2008

  • NIOSH
    IC 9246 Assessment Of Accident Risk During Haulage Truck And Power Shovel Maintenance And Recommendations For Improved Safety

    By Thomas J. Albin

    U.S. Bureau of Mines research has found that maintenance of surface mining equipment is involved in slightly more than one-third (34.1 pct) of all surface mining accidents. Two groups of machines, hau

    Jan 1, 1990

  • SAIMM
    Crush pillar support - designing for controlled pillar failure

    By M. du Plessis, D. F. Malan

    "The aim of any mine design is to ensure that the excavations remain stable for the period they will be in use. Various pillar systems are used to ensure that underground stopes remain stable and that

    Jan 1, 2015

  • SME
    Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

    By Jamal Rostami, Ataollah Rahbar

    "Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a

    Jan 1, 2016