Search Documents

  • SAIMM
    Measurement of in situ stresses in deep drillholes for a hydroelectric project

    By N. Kumar, A. K. Dhawan, A. Varughese, S. K. Khullar

    Abstract The in-situ stress field is one of the primary parameters influencing the performance of underground structures particularly in the Himalayas where there is strong influence of topography

    Jan 1, 2003

  • NIOSH
    Mineral Resources Of The Mt. Henry Rare II Area (No. 1-666), Lincoln County, Montana ? Summary

    By Martin D. Conyac

    A mineral resource survey of rock types and geologic structures indicates that the Mt. Henry RARE II area has low potential for the discovery of metallic minerals. Potential for coal and geothermal re

    Jan 1, 1982

  • SAIMM
    Ignition from conveyor idler rollers

    By J. Gummer, M. Williams, S. J. Hawksworth

    A common problem encountered in British coal mines is bearing failure on conveyor system idler rollers, which on occasions has led to fires. The UK Mines Inspectorate initiated a study of such failure

    Jan 1, 2003

  • SAIMM
    The response of shotcrete to blast induced vibrations in mining

    By L. Malmgren, A. Ansell

    This paper deals with the influence from blast induced stress waves on the performance of shotcrete support in the Kiirunavaara mine. Time histories of stress waves from blasting were obtained from me

    Jan 1, 2003

  • TMS
    Characterization of a Natural Biofoam from the Buriti Palm Tree

    By Lucas Lopes da Costa

    In this work, a natural foam extracted from the Amazon buriti palm tree is investigated as possible substitute for synthetic foams. The basic physical and mechanical properties of this biofoam were ev

    Jan 1, 2010

  • NIOSH
    OFR-116-81 Tape Recording And Triggering Systems

    By Kenneth R. Sites

    Under this program two tape recording and triggering systems were developed and delivered for use in the Bureau of Mines microseismic program. The systems are designed to improve the effectiveness of

    Jan 1, 1980

  • SME
    Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the Netherlands

    By M. van Elp, R. Saitua Nistal, P. J. M. Groot

    Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i

    Jan 1, 2011

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • SME
    Inability to communicate : How technical professionals cut short their management careers

    By H. Richard Eisenbeis, Donna M. Watkins

    Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort

    Jan 8, 1987

  • CIM
    Ignition of sulphide dust clouds by explosives

    Experimental Mine, Val d'Or, Quebec, Experiments on the ignition of sulphide dust clouds by explosives have been conducted in a 1 m3 explosion chamber. The explosives tested are ANFO, emulsion, a

    Jan 1, 1993

  • ISEE
    Changing the Landscape of Surface Mining through Fully Wireless Initiation Systems

    By Nolan Eckroade, Nigel Pereira

    Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly

  • SME
    A Review Of The Analysis Of Amphibole Fibers

    By K. A. Allison, D. R. Van Orden, R. J. Lee

    Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici

    Jan 1, 2005

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • AUSIMM
    Predicting Water Recovery from Flotation Cells

    Predicting Water Recovery from Flotation Cells

    Sep 13, 2010

  • AUSIMM
    The Waihi Gold Permitting Experience: Would the Proposed Changes to the Resource Management Act 1991 have made a Difference?

    The areas of concern lay in the processing of, and the subsequent hearing into, Waihi Gold's resource consent applications to extend Martha Mine. The proposed amendments to the Resource Managemen

    Jan 1, 1998

  • NIOSH
    Mineral Investigation Of The John Muir Wilderness; Fresno, Inyo, Madera, And Mono Counties, California

    By Fredrick L. Johnson

    In deposits of the John Muir Wilderness, tungsten is the principal metallic element. Gold, silver, copper, and molybdenum could be recovered as by-products from most of the tungsten deposits. More tha

    Jan 1, 1981

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.

    Jan 1, 2007

  • NIOSH
    OFR-49-75 Seismic Mine Monitor System - Phase IV Report

    By J. C. Fowler

    The field testing of the Seismic Mine Monitor System is described. This system consists of nine geophones buried about 40 feet deep over a ten-square-mile area, the amplifiers and electronics needed t

    Jan 1, 1974

  • CIM
    Méthode long trou à la Mine Mouska

    By Karl Marquis

    La Mine Mouska exploite depuis deux ans certains blocs de réserve à l?aide de la méthode long trou. Même si, à priori, la méthode long trou semble rentable, le contrôle de la dilution ainsi que le res

    Oct 1, 2001

  • TMS
    Metallurgical Considerations For Recycling Siliceous- Bearing Materials In The Mitsubishi Continuous Copper Converter

    By Fumito Tanaka

    The Mitsubishi Process is the sole pyrometallurgical process for the continuous production of blister copper from copper concentrates. Continuous converting originates from the application of the pro

    Jan 1, 2005