Search Documents

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • IIMP
    Exploración geológica y geofísica en las minas de Cercapuquio (II)

    El presente artículo señala que el proceso de exploración en superficie de la mina de Cercapuquio para determinar nuevas zonas mineralizadas, es de difícil actuación a causa de la falta de ganga en es

    Oct 1, 1955

  • NIOSH
    IC 8393 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Shell Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for the design of a shell and tube heat exchanger on a price optimum basis for the following conditions: (1) Triangular pitch; (2) single or multiple pass; (3) heating o

    Jan 1, 1968

  • AUSIMM
    GekkoÆs Gravity, Flotation and Intensive Leaching (GFIL) Process for Gold Recovery Improves Environmental and Cost Outcomes

    By T Hughes

    Upward pressure on all mining operations is coming from the triple bottom line. To some extent this is being offset by the rise in mineral prices, but this may or may not continue. The other serious i

    Jan 1, 2007

  • AUSIMM
    Towards More Sustainable Minefills - Replacement of Ordinary Portland Cement with Geopolymer Cements

    By G F. Brent, R D. Hart, C Carr, F Felipe

    In underground operations, where copper, gold and other metals are mined, the open stopes can be backfilled to stabilise surrounding workings. This fill may consist of tailings from the processing pla

    Jan 1, 2007

  • NIOSH
    RI 6204 Measurements Of Surface Subsidence, San Manuel Mine, Pinal County, Ariz. ? Summary

    By George H. Johnson

    This report describes the procedures and summarizes the results of an investigation of surface subsidence above caving blocks at the San Manuel mine, San Manuel, Ariz., in order to obtain quantitative

    Jan 1, 1963

  • IIMP
    Sistema de control maestro para sopladores en paralelo

    By Richard Manrique

    "La implementación del proyecto de modernización de la fundición de cobre de Southern Peru Copper Corporation requiere cambiar la metodología de funcionamiento de los sopladores para la etapa de conve

    Sep 19, 2006

  • SME
    Nature Friendly Sustainability: Mining

    By M. Javier

    This concept paper is presented in the hope of raising the awareness of mankind on the necessity for its peaceful coexistence with nature. It is a food for thought. It takes compromise and sacrifice o

    Feb 27, 2013

  • SME
    Current Concepts in Coal Export Terminal Design

    By R. W. Carn, D. Vincent

    Environmental Considerations With significant increases in bulk coal movements through terminals, operators are under constant social and political pressure to reduce or remove environmental pollut

    Jan 7, 1983

  • NIOSH
    RI 6000 The Suspended Specimen Method For Determining The Rate Of Steam-Carbon Reaction ? Summary

    By W. T. Abel

    The rate of the steam-carbon reaction, which is of fundamental importance to coal gasification, was determined by passing steam over graphite specimens suspended in an electrically heated tube. The me

    Jan 1, 1962

  • DFI
    History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Bruce Haldeman

    Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th

    Jan 1, 1984

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives

    By M. A. Reyes, L. Yan

    Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i

    Nov 22, 2019

  • SAIMM
    Hydraulic support instability mechanism and its control in a fully-mechanized steep coal seam working face with large mining height

    By F. T. Wang, Y. Yuan, S. H. Tu, X. G. Zhang

    Hydraulic support instability (HSI) is one of the most common causes of disasters in underground coal mining, posing a threat to the safety of mine workers and normal operation of the equipment. It is

    Jan 1, 2015

  • SME
    The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, Ut

    By P. J. Bethell

    Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod

    Jan 1, 2008

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • NIOSH
    IC 8765 Projects To Expand Fuel Sources In Eastern States - An Update Of Information Circular 8725 - Survey Of Planned Or Proposed Coal Mines, Coal And Noncoal Conversion Plants

    By David C. Benson

    This Bureau of Mines report is an update of IC 8725 and comprises tables listing the name, location, and other pertinent data concerning certain fuel-related projects. The tables include information o

    Jan 1, 1978

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • AUSIMM
    Sulphur Deposits of New Zealand

    Owing to the increased consumption of sulphuric acid; Australian manufacturers have, from time to time, been seeking for a satisfactory source of sulphur that would make them independent of foreign su

    Jan 1, 1925