Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing ProgramBy William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) WallBy Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney
The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke
-
Design And Testing Of Deep Foundations For Wind Turbines In Western AlaskaBy Lorie M. Dilley
Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an
Jan 1, 2010
-
New Findings on the Capacity of Connections between Micropiles and Existing FootingsBy João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez
"Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou
Jan 1, 2015
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Influence of Surface Replacement Layer on Behavior of Laterally Loaded Large Bored Piles in Soft Clay: Pile Load Tests and Numerical InvestigationBy Hayel M. El-Naggar, Mohamed Sobhi, Mamdouh M. Hamza, Marawan M. Shahien
"This paper presents the results of two lateral load tests on large bored piles in soft clay deposit for a major site in northern Egypt. The tests are carried out on 0.8 m diameter piles. One of the t
Jan 1, 2016
-
Behavior Of Pile Groups Arrangement Adjacent To A Sand Slope Under Lateral LoadBy Mohamed A. Sakr
An experimental study on the behavior of pile group's arrangement under lateral load was carried out in the level ground and at crest of sand slope 3H: 2V. Tests were conducted on single pile and
Jan 1, 2010
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Seven Mile Dam Retrofit - A Global ChallengeBy Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
Double Rotary Head Piling Systems (Cased CFA)By Franz-Werner Gerressen
In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established
Jan 1, 2009
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, CaliforniaBy Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Soil Fatigue Analysis for Pile Driving Simulations Using an Impact HammerBy Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer
"For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h
Jan 1, 2017
-
How Well Do Helical Piles Resist Earthquakes as Foundation Systems? WHERE TO GO FROM HERE?By Amy B. Cerato, Shawn Allred, Tatiana Vargas
"Helical piles are deep foundation elements that resemble, and are installed like, a large steel soil screw — they have a slender steel shaft with one or more round helix bearing plates welded to the
Jan 1, 2017
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope StabilizationBy Nasr Sheta
"After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability
Jan 1, 1900
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult GeologyBy A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Diggs Does Deep FoundationsBy Robert Bachus, Nikolaos Machairasm, Allen Cadden
Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi
Jan 1, 2019