Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Radium Hospital Project In Oslo, NorwayBy Wojciech Szczepiński, Dominik Gächter
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Oct 1, 2021
-
Radium Hospital Project in Oslo, Norway.By Dominik Gächter, Wojciech Szczepiñski
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Sep 8, 2021
-
Structural Evaluation of Thermal Integrity Profile Results of Transmission FoundationsBy Ryan Weaver, Travis Coleman
The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b
Jan 1, 2019
-
A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation PilesBy Chris Leach, Lucie Spencer
This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste
Nov 1, 2022
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in RomeBy Bruno Vingiani, Alessandro Bertero
"The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t
Jan 1, 1900
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
In-Situ Ground Reinforcement TechniquesBy P. J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 2010
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Performance Specifications For Drilled PilesBy Dan Brown
Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative
Jan 1, 2006
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation SubcontractorsBy Alexander Filotti, Richard Kalson
"1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti
Jan 1, 2017
-
Simplifying the Design of Laterally Loaded Piles for Waterfront StructuresBy Amanda R. Parry, Chris R. Pray
Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of
Sep 8, 2021
-
Ground Freezing In Urban Areas And Under Special ConditionsBy Frank Haehnig
Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground
Jan 1, 2008
-
Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl TestsBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD
The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval
Oct 1, 2022
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016