    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa

    By Akshay Sakhuja, M. S. Karthika, R. Vignesh

    "The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup

    Jan 1, 2015

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Sheet Piling Bridge Abutments

    By Robert J. Carle

    This paper reviews a variety of highway structures which have been built using steel sheet piling as the permanent structural elements of bridge piers, abutments and wingwalls. Those structures built

    Jan 1, 1989

  • DFI
    Monopile Construction Technique For Mumbai Coastal Road Package 1 - Mumbai

    By T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D

    The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir

    Sep 1, 2022

  • DFI
    Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft Foundations

    By Chunli Wei, Mark Jen, Xiaojun Wang

    "After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i

    Jan 1, 2016

  • DFI
    Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and Micropiles

    By Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen

    "This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build

    Jan 1, 2017

  • DFI
    Interpretation and Evaluation of Thermal Integrity Profiling Measurements

    By Seth Robertson, Daniel Belardo, Travis Coleman

    Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust

    Sep 8, 2021

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Estimation Of Modulus Of Deformation Of Ground From Axial Compression, Pullout And Lateral Load Tests On Single Pile

    By Madhav, V., M. R., Ahmad, Padmavathi, M. S.

    Modulus of deformation (Es), also referred to as elastic modulus is dependent on many variables such as type of loading, degree of anisotropy and non-homogeneity of strata, etc. and is one of the most

    Sep 1, 2022

  • DFI
    Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CA

    By Eric Lindquist, John Compagnone, Gabriel Carvajal

    "Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq

    Jan 1, 2017

  • DFI
    An Analysis of LRFD for Helical Anchors

    By Ronaldo Luna, Donald Deardorff

    "The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963

    Jan 1, 2009

  • DFI
    Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site Ii

    By Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally

    Oct 1, 2022

  • DFI
    Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven Piles

    By Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell

    The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their

    Sep 8, 2021

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Simulation Of Soil-structure Interaction With Sheet Pile And Retained Soil

    By Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel

    Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line

    By Benjamin Jennings, Jason Herron

    In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis

    Jan 1, 2017