Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • CIM
    SPOC Project Software and Manual

    By R. F. Pilgrim

    "This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a

    Jan 1, 1986

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Use of the Latest Technology to Overcome the Demands of Mill Operation

    By Tatiana Ravani von Ow, Leandro Bomvisinho

    "The size of mills driven by ring-gear or by a gearless solution has significantly increased in the last years. This has created additional challenges for the driven equipment. The requirements for th

    Jan 1, 2010

  • CIM
    25 Years of Base Metal Processing

    By H. P. Jacobi

    "The last 25 years have seen tremendous economic pressure placed upon the base metal processor. Industry has responded with technological innovations that have contributed to significant reductions in

    Jan 1, 1987

  • CIM
    Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., Mexico

    By S. Cossio, J. L. Noyola, R. Espinosa

    "Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con

    Jan 1, 2004

  • CIM
    Electric-Pulse Disaggregation (Epd), Hydroseparation (Hs) and Their Use in Combination for Mineral Processing and Advanced Characterization of Ores

    By Vladimir N. Rudashevsky, Louis J. Cabri, Nikolay S. Rudashevsky, Thomas Oberthür

    "EPD (Electric Pulse disaggregation) and HS (hydroseparation) are exceptional technologies for research, concentration, evaluation, and mineral extraction of specific minerals such as precious metals

    Jan 1, 2008

  • CIM
    Why SA Matters: Cost of Lacking Operator SA

    Scope / Agenda ? What is Situation Awareness (SA)? ? Background on SA theory ? SA is critical in a wide variety of domains ? SA and human performance ? Consequences of poor SA ? Significant chal

    Aug 1, 2013

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • CIM
    Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*

    By M. Vallée

    "RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l

    Jan 1, 2005

  • CIM
    Building the Next Major Iron Ore Mine in the Labrador Trough

    Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu

    May 1, 2011

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Explore the Future of Mining

    By Joe Shoemaker

    Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width

    Aug 1, 2013

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet Plant

    By Jean-Pierre Côté, Alexandre Noiseux

    "Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d

    Jan 1, 2010

  • CIM
    A comparison of thermally alloyed Zn-Fe coatings produced by mechanical wiping to those produced by post-coating annealing

    By J. P. Landriault, F. W. Harrison

    "Zinc-iron alloy coatings can be produced by either thermally alloying hot-dipped galvanized steel or by electro deposition. Stelco Inc. produces a thermally alloyed Zn-Fe alloy-coated steel, which is

    Jan 1, 1987

  • CIM
    The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery Circuits

    By Z. Xiao, A. R. Laplante

    "The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri

    Jan 1, 2001

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    Geology and Mineralogy of the Hercynian Koudiat Aïcha Polymetallic(Zn-Pb-Cu) Massive Sulfide Deposit, Central Jebilet, Morocco

    By E. Marcoux, F. Lotfi, A. Belkabir, L. Maacha, A. C. Brown, S. Brunet

    "Koudiat Aïcha is a small Zn-Pb-Cu deposit, enclosed in the Visean Sarhlef volcano-sedimentary series of the Moroccan Hercynian Jebilet massif. Base metal mineralization is located between a basal uni

    Jan 1, 2008