Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Experimental characterization of the noise generation mechanism of percussion drill rods

    By Y. Champoux, N. Atalla, R. Oddo, C. Lesage

    "Percussion drills are the source of the most serious noise problems in mining activities, due to their extremely high noise levels(114-122 dB(A)) and widespread use(Bartholomae and Stein, 1988). Perc

    Jan 1, 1997

  • CIM
    Experimental Study On Application Of Bleed In Acid Isl

    By Meifeng Zhi, Yuqing Niu, Xixin Chang, Fengqi Zhao, Weimin Qiu, Hao Wang, Zhenqian Wen, Zujun Shu

    An applicable Eluex process was developed for acid in-situ leaching (ISL) uranium mine in Bayanwula. In this process, uranium was adsorbed with strong base anion resin from the pregnant solution, then

    Jan 1, 2020

  • CIM
    Improving Flotation Circuit Performance with a Large Mechanical Flotation Cell

    By R. Grau

    "After commissioning and start-up of the first 500m3 TankCell® flotation cell in 2014, the over 300m3 mechanical flotation cells have earned their place in large-scale flotation operations. These 500

    Jan 1, 2019

  • CIM
    OPSCAP Victor Project's Transition to Operations

    By Brian Rausch

    Agenda ?? Refresher: Victor Project Execution ?? Operations Capability roadmap: ? Operations staffing starter group: design participation ? Operations staffing build up for production start-up ?

    May 1, 2009

  • CIM
    Mine Laronde ? Expansion ? 4500 Tonnes Par Jour

    By Paul-Henri Girard

    La Mine Agnico-Eagle division Laronde situé à Cadillac, est un producteur d?or, d?argent, de cuivre et de zinc. Cette propriété est situé dans les cantons Bousquet-Cadillac le long d?une des ceintures

    May 1, 2001

  • CIM
    Characterization of rock mass behaviour using mining induced microseismicity

    By T. I. Urbancic, C-I. Trifu

    "ABSTRACTSeveral case studies are presented on the use of seismic techniques to map active structures, evaluate changes in stress levels, and identify the conditions leading to large magnitude seismic

    Jan 1, 1997

  • CIM
    Pronto Mine

    By Stanley W. Holmes

    "The discovery of extensive uranium mineralization on the Pronto property in April 1953 initiated a program of staking, exploration, and development unparalleled in Canadian mining history. Within twe

    Jan 1, 1949

  • CIM
    Notes on Fire Prevention and Fire Insurance for Mine Buildings

    By W. G. Millar

    Until a fire occurs, insurance and prevention work are often looked on as unavoidable necessities, but as insurance is back of all business credit, it is essential to know that in case of damage money

    Jan 1, 1928

  • CIM
    Investigation of an active noise control system to reduce the noise emitted by an industrial stack

    By Martin Bouchard, Bruno Paillard, Jean-Claude Dubé, André L’Espérance

    "A precise analysis of the noise emitted by an aluminum plant has shown that one of the main sources of noise is the noise emitted by an exhaust stack 40 m high and 1.8 m diametre, emitting a pure ton

    Jan 1, 1997

  • CIM
    Muskeg -A Review of Engineering Progress

    By R. A. Hemstock

    "Simple classification systems are now being used which will describe adequately the surface vegetation, the topography and the peat for any muskeg condition. Good progress is being made in determinin

    Jan 1, 1960

  • CIM
    The Similkameen Project

    By J. H. Parliament

    "The 15,000-tpd Similkameen open-pit copper mine, 10 miles south of Princeton, B.C., started production during 1972. The two main ore zones are separated by the deep canyon of the Similkameen River, w

    Jan 1, 1973

  • CIM
    Fine particles removal from oil sand tailings by hydrocyclone

    By R. Burns, A. I. A. Salama, M. W. Mikhail

    "Large amounts of oil sand tailings are produced in the Fort McMurray area, including sand, clays, and misplaced bitumen. The objective of the present study (as part of the overall engineered tailings

    Jan 1, 1997

  • CIM
    Comparison of Low vs High Discharge For Ball-Mills (Transactions, Volume XL, 1937, pp. 325-332)

    By The Hollinger Mill Staff

    MR. E. L. Longmore (l), in presenting this paper at the Annual General Meeting, suggested that it was neither desirable nor necessary to read any but the briefest portion of the paper. He wished to em

    Jan 1, 1937

  • CIM
    The Crystallography of Niocalite

    By J. E. Rowland

    NIOCALITE is a new mineral species which has been identified in rock from the Oka district, Quebec. It occurs as prismatic crystals up to l 0 mm. in length and I mm. in width, in coarse, white, crysta

    Jan 1, 1957

  • CIM
    Iron Ore Company of Canada (IOCC)'s New Silica Flotation Plant

    By Mike Smith, George Chung

    "A 23 million dollar Flotation Plant has been commissioned at the Iron Ore Company of Canada in 1998. Nine OK-50 cells &re used to float silica in this 1,400 tomes per hour plant. The paper details pr

    Jan 1, 1999

  • CIM
    Electrodeposition Behavior Of Dendritic Copper From Aqueous Copper(I) Chloride Solutions Containing Condensed Sodium Halides

    By K. Murase

    Potentiostatic electrodeposition behavior of dendritic copper from acidic copper(I) chloride (cuprous chloride) baths containing sodium chloride and sodium bromide was investigated. The morphology, or

    Jan 1, 2007

  • CIM
    The Influence of the Fe3+/Fe2+ Redox Couple on the Chalcopyrite Leacidng

    By E. M. Córdoba

    The effect of the Fe3+ lFe2+ redox couple on the chemical and biological dissolution of chalcopyrite was studied. All the tests were carried out in stirred flasks with 100 mL of a ferric/ferrous sulph

    Jan 1, 2007

  • CIM
    Determining of Drivetrain System Skid Steer 6x6 Wheeled Robot Load

    By Lopatka. M. J.

    This paper presents the results of 3 tons skid steer 6x6 wheel robot drive system field tests. The aim of the investigation was verification of assumed data for drivetrain diesain and forces identific

    Aug 1, 2013

  • CIM
    Chapter 2. The Courts, the Law and Litigation

    By Karl J. C. Harries

    "2.1. INTRODUCTIONNo agreement can be perfect in the sense that it contemplates and provides for all eventualities. Mineral acquisition agreements are usually negotiated and drafted at a time when an

    Jan 1, 2003

  • CIM
    Ironworking in Upper Canada: Charles Hayes and the Marmora Works

    By Rita Michael

    "The Marmara Ironworks was not the earliest ironworks in Ontario, but it was distinguished from other early works in a number of ways. It was established on an ambitious scale as a self-sufficient and

    Jan 1, 1999