Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The necessary role of the geologist in geotechnical data gatheringBy P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agentsBy F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld
The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches
Jun 19, 2024
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?OperationBy R Wynn, R A. Pax, S Mann, B Cornish
The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u
Sep 1, 2014
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Drift and Fill - The High Value, High Recovery Mining SystemBy M English, M Yumlu
At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of
Jan 1, 2008
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Unique Coal Mine Drift Construction MethodBy C Donnelly
Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa
Mar 21, 2011
-
Leadership in Projects – A Recipe for SuccessBy A A. Roberts, R F. Dewhirst
"Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m
Mar 8, 2016
-
Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining InvestmentBy J P. Sykes, C Gemell, A Trench
The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing
Jun 22, 2016
-
Implications of the Carbon Price and Developing a Carbon StrategyBy P Holt, M Allen
On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa
Nov 20, 2012
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
Rock Strength Anisotropy and Its Importance in Underground Geotechnical DesignBy M Sandy, A Vakili, J Albrecht
Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati
Nov 5, 2014
-
The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western AustraliaBy T Wellman, G Sternadt, R Hingston
The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos
Aug 18, 2014