Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Airborne Gravity Gradiometry and Magnetics in the Search for Economic Iron Ore Deposits

    By R Miller

    The enrichment of magnetite to haematite and haematite-goethite leads to a coincident magnetic low and gravity high within the banded iron formation. Palaeochannel deposits of pisolitic limonite can b

    Jul 11, 2011

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    Is the Python Right for Me? Python

    Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr

    Aug 1, 2010

  • AUSIMM
    How to Create a Perfect Storm

    By A Chadwick, J de Ross, C Adams

    Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea

    Nov 20, 2012

  • AUSIMM
    Discovery of the Corunna Downs Deposits

    By P J. Howard, P Darvall, J H. Mainwaring

    In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south

    Jul 13, 2015

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite Feed

    By R Jones

    OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene

    Jul 11, 2011

  • AUSIMM
    Deck hands needed! Experience necessary – addressing the impending qualified tailings professional resource shortage

    By K J. Ward, C N. Hatton, J Scalia IV, C A. Bareither, D L. Spencer

    The mining industry is experiencing change in the governance of tailings facilities (TFs). Guidance and regulations across many jurisdictions contribute to this amorphous change. The Canadian Dam Asso

    Jul 1, 2021

  • AUSIMM
    Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHD

    By C McGuire

    As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli

    Oct 12, 2022

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracy

    By D Reid, J McKibben, M Noppe

    International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo

    Mar 22, 2022

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale Experiments

    By D Maldonado

    BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in

    Jul 11, 2011

  • AUSIMM
    Neural Net for Diagnosis of Antifriction Bearings in Mining Machines

    By KeBler H-W, Seeliger A

    Vibration analysis for diagnosis of machines is a powerful instrument for condition monitoring. Especially for diagnosis of antifriction bearings various equipment and techniques have been developed

    Jan 1, 1995

  • AUSIMM
    Why Reinvent the Wheel when there are Established Methodologies to Aid the Design and Assessment of Restored Natural Ecosystems on Mined Land?

    By R N. Humphries

    The aim of this paper is to question the need to develop bespoke monitoring and assessment methodologies and criteria, thereby ‘reinventing the wheel’, when designing and assessing the success of impo

    Jul 16, 2014