Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving the Fluxed Pellets Performance by Hydrated Lime Instead of Bentonite as Binder

    By J Pan

    In this paper, the technology of producing fluxed pellets by using hydrated lime as binder instead of bentonite was carried out. The properties of the two types green balls (0.8 per cent bentonite and

    Jul 11, 2011

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of Moranbah

    By S Lockie, G Ivanova, J Rolfe

    One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r

    Jan 1, 2009

  • AUSIMM
    Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine Voids

    By A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo

    Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo

    Nov 4, 2015

  • AUSIMM
    Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining Operations

    Over the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec

    Jan 1, 1999

  • AUSIMM
    Current Issues in the Mining Industry - From the Operational Mineral ProcessorÆs Perspective

    By S Schwarz, D Alexander

    The mining industry, and in fact the world, has undergone significant changes in the past five to ten years, ranging from the metals boom, the global financial crisis and the rise and fall of national

    Oct 29, 2012

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    Outside Auger Hollow Claw Tipped Mechanical Sampler for Coal

    By Z-Y Pi, B Zhang, S Wen

    "The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i

    Aug 21, 2012

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid setting

    By P Chapman, B Moosapoor

    The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study

    Jul 1, 2021

  • AUSIMM
    Structural and Lithological Controls on the Location of Orebodies in the Baizhangzi Lode Gold Deposit in Western Liaoning Province, China

    By L Xiong, W J Shi, J H. Wei

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baizhangzi gold deposit is located in the northern North China Craton. The structural a

    Mar 18, 2015

  • AUSIMM
    Driving Mine Performance through Communication

    By S Jeffrey, S Mundell, F Arboleda

    In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr

    Jun 22, 2016

  • AUSIMM
    Options for Concentrate Drying Technologies when Designing a Copper Smelter

    By H Lehtonen, H Mansikkaviita

    In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect

    Jan 1, 2006

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered Coalmine

    By F Wu, H Wang, W Chen

    A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe

    Aug 31, 2015

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith Operations

    The Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt

    Jan 1, 2007

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021