Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working face

    By S Li, Y Lei, X Wu, C Ma, W Q. Zhang

    The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in

    Nov 29, 2022

  • AUSIMM
    Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modelling

    By W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings

    Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini

    Nov 21, 2018

  • AUSIMM
    Progress in Developing a Geometallurgy Flotation Indicator

    By T Napier-Munn, D J. Bradshaw, M Chauhan, L Keeney

    An important aspect of geometallurgy is quantifying mineral processing attributes, which leads to improved orebody understanding. One of these attributes is flotation performance. Several methods have

    Sep 29, 2013

  • AUSIMM
    Mining 4.0 initiatives – a pathway to a smarter mining fleet

    By K Rau

    The overall success of a mining operation is directly impacted by the reliability and availability of mining equipment. Heavy-duty vehicles such as excavators and haul trucks are used for conveying of

    Sep 1, 2024

  • AUSIMM
    A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine

    By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr

    Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the

    Nov 29, 2022

  • AUSIMM
    Envisioning the rehabilitation of assets through co-design and gamification

    By S Grant, S Emeric, P Baker, E Jones, D Clark

    As we strive for a sustainable and resilient future, repurposing assets has become a top priority. In Australia alone, we have a significant number of mineral projects in the pipeline, extensive exist

    Aug 2, 2023

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    A geotechnical risk assessment tool for underground mine drives

    By H Esterhuizen, W Hartman

    Rockfalls or significant deterioration of mine openings can have significant safety and financial impacts for mining operations. The failure of drives in underground mines sometimes highlight deficien

    Nov 30, 2018

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to Implementation

    Tailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of

    Jan 1, 2009

  • AUSIMM
    Challenges and solutions for deformation management of Cannington’s hoisting shaft

    By A Clarkson

    Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s

    Mar 29, 2023

  • AUSIMM
    Solubility of nitrogen and inclusion characteristics in high aluminium steels

    By M M. Pande, M Ishfaq

    The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni

    Jun 19, 2024

  • AUSIMM
    PMAP – smart and sustainable in situ treatment of mine wastewater and critical metals recovery technology

    By M Barkh, F X. Spachtholz

    The mining industry faces significant environmental challenges in managing tailing ponds and wastewater treatment, including the risk of contaminated water, breaches of tailing dams, and energy-intens

    Sep 1, 2024

  • AUSIMM
    Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate Right

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • AUSIMM
    Potential TWA changes for gas monitoring instruments are alarming

    By P Aspinall

    Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst

    Apr 16, 2024

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024