Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By A Sinuhaji, R Poedjono, G Flumerfelt

    PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This pap

    Jan 1, 2002

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Structural analysis and modelling in an evolving mineral resources operation

    By N Arrys, A Jani, S Shahin

    Optimising pit slope stability and reducing strip ratio of a mining operation are two key tasks in geotechnical engineering. With a growing demand for minerals and an increasing cost associated with e

    Sep 1, 2024

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    The Evolution of Diamond Drilling Practices at Olympic Dam

    By J Taylor, A Dubowik

    To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a

    Aug 18, 2014

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • AUSIMM
    A new look at detrital iron deposit geology of the Hamersley Province of Western Australia

    By C Simpson, J M. F Clout, G Plummer

    Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product

    Nov 8, 2021

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USA

    By J Furtney, W Fu, D Nutakor, A Brose

    Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in

    Jun 22, 2022

  • AUSIMM
    Characterisation of In Situ Stresses for Tunnel Lining Design in the Sydney?Basin

    By A L. de Ambrosis, S J. Clarke

    In the non-codified realm of tunnel design there are issues which are sure-fire instigators of controversy. This paper presents a discussion regarding one particular issue which in the authors’ experi

    Sep 17, 2014

  • AUSIMM
    Performance of Different Constructive Solutions against Explosions in Full-scale Masonry Walls

    By M Chiquito, R Castedo, P Segarra, L M. López, J A. Sanchidrián, J Navarro

    The aim of this work is to assess the performance of different constructive solutions against explosions on the strength of masonry walls. The solutions tested, namely an external metal mesh, a glass

    Aug 24, 2015

  • AUSIMM
    Investigating psychosocial incidents and gendered violence for enhanced mine safety outcomes

    By D Flint, K Vague

    The Work Health and Safety Act 2020 (WA) (WHS Act; DMIRS, 2020) and associated Work Health and Safety (Mines) Regulations 2022 (WA) (WHS Regulations; DMIRS, 2022), supporting guidance materials and ot

    Apr 16, 2024

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    The necessity of 3D analysis in open pit, rock slope, stability analysis – in theory and practice

    By A Mcquillan, N Bar

    Geotechnical models developed during the open pit mine planning stage are generally three-dimensional (3D) in component to capture the spatial variation in geological, structural, hydrogeological and

    Nov 29, 2022

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    Application of Time Series Methods for Smelter Furnace Modelling and Control

    By Kam KM, Tran B

    Statistical techniques of Box and Jenkins (1976) have been used to assess the existing control schemes and determine the dynamics of flash smelting furnace at the Kalgoorlie Nickel Smelter. Pertinen

    Jan 1, 1996

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Nature and Distribution of Gibbsite in Some Western Australian Iron Ores

    By M Paine

    Work to date has shown that the use of Al2O3:SiO2 ratios is suitable for identifying potential gibbsite bearing samples. Subsequent confirmatory XRD analysis helps to refi ne this initial identificati

    Jul 11, 2011

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015