Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Discrete Fracture Network Modelling for Tunnel Design in the Sydney BasinBy A L. de Ambrosis, F M. Weir, M Fowler
Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass
Sep 17, 2014
-
The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs NorthBy R Beaulieu, D Burlingame, C Hanks
The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development
Jan 1, 2002
-
Development and Testing of a Small-Scale Uranium Leach for Geometallurgical ApplicationsBy N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis
Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg
Sep 29, 2013
-
Water Footprint for a South African Platinum MineBy K G. Harding, E L. Haggard, C M. Sheridan
Mining is a water intensive sector, contributing to declining water resource quality around the world. Improvements to current mine water management practices can help reduce the amount of water utili
Nov 26, 2013
-
Dilution rating system (DRS)By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers
Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec
Mar 15, 2021
-
Practical Approaches to Managing Business Critical Water RiskBy A Tang, K Ringwood
"Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu
Nov 26, 2013
-
Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine SealsLegislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov
Jan 1, 2005
-
A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, SwedenBy R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian
Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v
Aug 24, 2022
-
Blasting Near Mine Surface InfrastructureBy A J. Moore
Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established
Nov 8, 2011
-
A simple and accurate method for Ore Reserve estimation and Mineral Resource depletion in caving minesBy A D. Campbell
Conversion of Mineral Resources to Ore Reserves requires a multidisciplinary approach and application of a number of Modifying Factors. The Modifying Factors for mining, particularly dilution and reco
Oct 16, 2017
-
Water Treatment at the Waihi Gold MineBy B Twidle, D Bertoldi, J Meikle, R Dunne
The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year
Sep 26, 2013
-
The Discovery of the Wabu Ridge Gold Skarn, Irian Jaya, IndonesiaBy L Soebari, W Sunyoto
The Wabu Ridge Gold Skarn deposit is located at elevations of up to 3100 metres above sea level, in the Central Highlands of Irian Jaya, Indonesia, 35 km NNW of the Grasberg porphyry deposit. Wabu is
Jan 1, 1999
-
Wall Control BlastingBy D P. Blair
There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential
Aug 24, 2015
-
Selection of Mine Water Management Options Considering both Water and Energy ImpactsBy M T. Nguyen, S Vink, M Ziemski
On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf
Nov 26, 2013
-
Assessment of Effectiveness of Artificial Recharge for Coal Seam Gas Water Management Based on Numerical ModellingBy C Rothfuss, X Wang, S J. Herbert, K Prasad
The extraction of groundwater to produce gas from coal seam gas (CSG) reservoirs has highlighted the opportunity for beneficial uses of groundwater in Australia. This paper presents an assessment of a
Nov 26, 2013
-
Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold MineBy P Trout, B Macaulay
Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success
Jan 1, 2005
-
Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off VolumesBy A Woodley, N C. Kunz
A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate
Nov 26, 2013
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012
-
Linking safety factor to probability of failureBy S M. Gover
Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty
Jul 23, 2018