Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Grinding Circuit Practices at Newmont

    By A Giblett, S Hart

    "In 2015 operations under the ownership and/or management of all Newmont Mining Corporation subsidiaries (Newmont) produced 5.7 Moz of gold and 619 Mlb of copper from mining operations in five countri

    Oct 10, 2016

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Benchmarking Energy Efficiency ù A Case Study at Macraes Gold Mine

    By K Osten, N Scagliotta, G Lane

    Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series

    Jan 1, 2004

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Alternative Underground Ore Transport Systems for the Jaguar Base Metal Deposit

    By W P. Darcey

    Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s

    Mar 21, 2011

  • AUSIMM
    Exploring Community Involvement in a Major Infrastructure Project û Case of an Oil Pipeline in Eastern Siberia

    Addressing community concerns in relation to an economic activity, particularly when it causes significant community impacts, is especially important for the development of extractive industry project

    Jan 1, 2009

  • AUSIMM
    An Overview of Surface Rock Support for Deformable Ground Conditions

    By M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson

    "Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface

    Mar 24, 2014

  • AUSIMM
    Direct Reduction Technology - The Western Titanium Process for the Production of Synthetic Rutile, Ferutile, and Sponge Iron

    By Clements R. J, Davey J. M

    Development of the process from the pilot stage to the current operation of the Capel, W.A. plant is briefly described. The design criteria for a larger sized plant are discussed together with fact

    Jan 1, 1979

  • AUSIMM
    SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success story

    By D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane

    The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and

    Aug 29, 2018

  • AUSIMM
    Dilution Control at Outokumpu Mines

    By Pitkajarvi J

    Waste rock dilution causes mill feed grade to be lower than mineral resource grade. In nickel mines relative grade decrease (dilution) may be tens of per cent because of irregular ore boundaries and

    Jan 1, 1996

  • AUSIMM
    Design, Development and Operation of a Hardrock Roadheader

    By Bromley JC

    Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up

    Jan 1, 1987

  • AUSIMM
    Morning Star Gold Mine Recoverable Ore Reserves = Mining Geology + Practical Cents

    By M D. Goodz, Wright R. F

    This paper highlights the importance of accurate observational technical reports compiled by Mining Geologists and Engineers. Before uncovering the original reports in July 1992, all previous investig

    Jan 1, 1993

  • AUSIMM
    Screening Experience at Australian Iron and Steel, Port Kembla

    The screening of iron ores, sinter and coke, and investigations undertaken to improve screening efficiency and cloth life are discussed. The major modifications to coke screening proposed with the

    Jan 1, 1984

  • AUSIMM
    Dewatering of Fine Coal Using Superabsorbents

    The moisture content of clean coal contributes significantly to the product's transportation costs, handleability characteristics and/or energy value. A major contributor to the total moisture

    Jan 1, 1994

  • AUSIMM
    Some Performance Characteristics of Ammonium Nitrate-Based Explosives

    By Hagan T. N

    Quite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more

    Jan 1, 1974

  • AUSIMM
    The Planning and Management of a Lignite Exploration Contract in Thailand

    An exploration and preliminary mine design contract was undertaken in Thailand to establish whether adequate lignite resources existed for the addition of future power generation plant through to

    Jan 1, 1983

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Evolution of the Continuous Miner

    This paper will trace the development of underground coal mining machinery from the days of the tiny air-powered machines to today's 60-ton electric-powered continuous miners. Some important d

    Jan 1, 1978

  • AUSIMM
    The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p

    Jan 1, 1988