Search Documents

  • CIM
    Current Mining Developments Committee Coal Division C.I.M.

    By H. Wilton Clark

    "IntroductionTHE CANADIAN use of short-period delay-action detonators in coal shooting has been carried on for about two years, mostly in British Columbia, and this is a preliminary report on progress

    Jan 1, 1953

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • AUSIMM
    The Geology of the Manto Verde Mine, Atacama Desert, Chile

    The Manto Verde mine is found in the coastal ranges of the Atacama desert, 1000 km north of Santiago,

    Jan 1, 1992

  • IOM3
    Development of seismic risk assessment method for application to rockburst-prone sites in deep-level South African gold mines

    By R. D. Stewart

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 18pp., 5 refs. A seismic

    Aug 1, 1995

  • IMPC
    Real-Time Condition Management of Critical Plant Equipment and Processes (ABSTRACT PAGE)

    By Rebecca Hope, Derick Moolman, Frikkie Malan

    "Despite the lip service that has been paid to pro-active plant maintenance processes over recent years, a significant portion of maintenance in industry is still reactive. The business driving force

    Jan 1, 2003

  • SME
    Crossing Fault Zones - Detailed Analysis for Radioactive Waste Repository Design

    By Tamás Megyeri, Dániel Borbély, Vera Szánto, László Kovács

    "Upon completion, the Bátaapáti deep underground radioactive waste repository complex (National Radioactive Waste Repository - NRWR) will provide safe final disposal for low and medium-level radioacti

    Jan 1, 2016

  • NIOSH
    Coal Bed Discontinuity Effects on the Production of Degasification Boreholes and on Emissions during Longwall Mining

    Geological discontinues in the coalbed, such as faults, sandstone channels, permeability facies, lithotype changes, and large scale partings in the coal seam, can cause intermittent production problem

    Jan 1, 2008

  • NIOSH
    IC 9276 Availability of Primary Nickel in Market-Economy Countries: A Minerals Availability Appraisal

    By Donald I. Bleiwas

    The U.S. Bureau of Mines has evaluated the potential availability of nickel from 36 deposits or districts in 16 market-economy countries (MECs), analyzing more than 95 percent of production in those c

    Jan 1, 1991

  • AUSIMM
    On the Mineral Composition of the Mount Oxide Copper Ore, Queensland

    The following brief observations on the mineral composition of the Mt. Oxide copper ore are intended to supplement the geological description of that ore-body recently published by Blanchard (2).&apos

    Jan 1, 1940

  • SAIMM
    Crud ForxTM - A New Approach to Crud Management

    By Sergio Burelli, Darren C. Megaw

    "Operational challenges associated with solvent extraction (SX) plants include the effective on-line management of solids introduced from a variety of process streams. Solids are carried over from lea

    Jan 1, 2015

  • AUSIMM
    An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel Caves

    By P Duplancic and C R Lilley, R Hudson, D Beck

    For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff

    May 9, 2016

  • AIME
    Coal - Coal Strip Mining-Is It Reaching a Peak?

    By Hubert E. Risser

    Although, for about a half-century the percentage of coal production provided through strip mining has steadily increased, recent trends indicate that a peak in percentage (not tonnage) is being appro

    Jan 1, 1970

  • IMPC
    Processing of Arsenic Bearing Gold Ores

    By T. V. Chnyrenkova, J. Troncoso, V. A. Luganov, G. P. Kluev

    "Arsenic-gold bearing ores are used as flux in smelting or are leached to extract gold. The main aim is to decrease the arsenic content in processed materials and to break up the ore lattice, thus lib

    Jan 1, 2003

  • IIMP
    ¿Son importantes las competencias para el ingeniero de minas?

    By Venancio Astucuri

    "El presente texto describe las cuatro competencias que debe poseer un ingenierio de minas para un desarrollo sostenible de la minería. Dichas competencias se dividen en personales, académicas, profes

    Feb 1, 2017

  • SME
    Prediction of Blast‑Induced Ground Vibration Using Principal Component Analysis–Based Classification and Logarithmic Regression Technique

    By M. P. Roy, P. K. Singh, A. K. Mishra, Ashish K. Vishwakarma, Vivek K. Himanshu

    Ground vibration is one of the major hazards produced by rock-blasting operation. The accurate prediction of vibration is necessary for designing controlled blasting parameters. The existing vibration

    Jul 30, 2022

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • SME-ICGCM
    Significant Weighting Events on the Longwalls in the Phalen Colliery

    By Bob J. MacDonald

    The Cape Breton Development Corporation is a federally owned Crown corporation in Canada that operates two coal mines the Prince and Phalen Colliery in the Province of Nova Scotia. Retreat longwall mi

    Jan 1, 1997

  • NIOSH
    RI 6892 Investigations Of The White Mountain Mercury Deposit, Kuskokwim River Basin, Alaska

    By Raymond P. Maloney

    The Bureau of Mines investigated the White Mountain mercury deposit, in the Kuskokwim River Basin, to better determine the extent of mercury mineralization and to encourage its development by private

    Jan 1, 1967

  • SME
    Horizontal Stress And Longwall Headgate Ground Control – Preprint 97-187

    By Thomas P. Mucho, Dennis Dolinar, Christopher Mark

    Horizontal stresses are caused by global plate tectonic forces. During 1995 alone, they were largely responsible for closing two U.S. longwall mines. This paper presents six case histories from Penns

    Feb 24, 1997

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006