Search Documents

  • AIME
    Open-Pit Mining Operations

    By L. E. Fish, G. S. Wyman

    CHUQUICAMATA open-pit mine is capable of producing a total of 105,000 tons daily. When the sulphide plant is operating to capacity the distribution of this quantity will be approximately 30,000 tons s

    Jan 1, 1952

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • NIOSH
    RI 5786 Experimental Extraction Of Strategic Components From S-816 Alloy Scrap ? Summary

    By H. Kenworthy

    The purpose of the study described in this publication is to develop methods for recovering simple master alloys or single metal components from discarded and scrapped S-816 alloy, The Bureau of Mines

    Jan 1, 1961

  • TMS
    Influence of Arsenic on the Chemical Wear of Magnesia-Chromite Refractories in Copper Smelting Furnaces

    By Katja Reinharter

    Arsenic can be found in different sulfidic copper concentrates and residues, which for several years have commonly been used in copper metallurgy, as the “arsenic-free” resources are getting rare. Due

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • SME
    How Smoke Hinders Escape From Coal Mine Fires

    By F. N. Kissell, C. D. Litton

    This study predicts the level of smoke that miners might meet while trying to escape a coal mine fire and describes how smoke would impede their safe escape. For this study, the authors assumed that m

    Jan 1, 1993

  • AUSIMM
    Online Slurry Analysis for Process Control and Monitoring at Iron Ore Concentrators

    By M J. Kongas, K M. Saloheimo

    This paper presents the art of on-stream particle size and elemental analysis used at iron ore concentrators, followed by the results and experiences from several sites.Online particle size analysis i

    Aug 12, 2013

  • SAIMM
    Common-Sense Improvements To Electric Smelting At Impala Platinum (J o u r n a l P a p e r)

    By V. Coetzee

    In 1992, a paper was compiled highlighting a common-sense approach to electric smelting at Impala Platinum. Since then, the smelter complex has undergone considerable changes. Mineral economics, UG2 e

    Jan 1, 2006

  • SAIMM
    Rapid Deployment Plant (RDP) For Tailings Treatment At Jwaneng Mine

    By E. Mpoloka

    Debswana together with ADP as their design partner have embarked on an RDP project at Jwaneng Mine. The objective of the project is to install a 2 million ton per annum mineral processing plant that w

    Jan 1, 2010

  • NIOSH
    State Statistics – Hopi Tribe

    The Hopi Reservation is in Arizona, where coal mining can be traced to the 13th century. Bituminous coal is found in varying quantities throughout the Hopi Reservation. The Hopi Tribe has a 50 per

    Jan 1, 1992

  • NIOSH
    RI 9176 - Comparative Study of Pillar Load Transfer Associated With Multiple-Seam Mining

    By R. J. Matetic

    The Bureau of Mines, as part of a program to improve mine planning and development, is currently investigating the effects of pillar load transfer, which can impact mining operations within a multiple

    Jan 1, 1988

  • AIME
    Saly Making by Solar Evaporation

    By W. C. Phalen

    The production of salt in the United States divides itself at the outset into two distinct classes…

    Jan 1, 1915

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • TMS
    Recent Developments in Injection Technologies at MEFOS

    "Injection technology has been an important subject from the early days of ladle metallurgy until the present. During the last decade, there have not been many publications in the area of injection te

    Jan 1, 1996

  • AUSIMM
    Versatility is the Name in Open Pit Drilling Equipment

    Traditionally, the predominant drilling method in open pit mining has been large hole rotary drilling using cumbersome, inflexible equipment offering merely limited scope for improvements in pit desig

    Jan 1, 2003

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • CIM
    Recent Patterns of Nickel Use and Development in China

    By I. Kirman, B. Waters

    World wide applications for nickel use will be summarized and examples of those uses given. Nickel products are critical to many important aspects of modern society. These products are just as importa

    Jan 1, 2005

  • IOM3
    Environmental aspects of coalbed methane extraction, with emphasis on water treatment and disposal

    By L. B. Clarke

    The optimal maintenance and control of the air flow and pressure distribution in a mine network are achieved by the correct positioning of the mine fans and regulators within the mine ventilation circ

    Jul 1, 1996

  • SAIMM
    Thought Processes During The Project Initiation Phase

    By H. Griesel

    The overall supply of platinum is forecast to rise more than the demand, and market deficit will narrow somewhat, but is still substantial at about 480 000 ounces. Because of this deficit, the price o

    Jan 1, 2004

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015