Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology
By Thomas W. McClain
This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac
Jan 1, 2001
-
Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments
By Leigh J. Wardle
Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri
Jan 1, 1992
-
Mobile Roof Supports For Pillar Retreat Mining
By Robert P. Kudlawiec
The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th
Jan 1, 2000
-
Jointing Effects On Pillar Strength
By Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones
By Martin Bolesta
The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination
Jan 1, 2001
-
Methods Of Controlling Thick And Strong Roof In Longwall Mining
By Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990
-
Site Characterization For Ultra-Close Multi-Seam Mining
By Yingxin Zhou
Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl
Jan 1, 1990
-
Economic Evaluation Of Subsidence Damage Mitigation Techniques
By David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining
By Zhang Liandong
Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r
Jan 1, 1990
-
Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars
By Hamid Maleki
Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv
Jan 1, 2000
-
Design Considerations For Angle Bolters
By Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
Cyprus Shoshone Tailgate Roof Control: Case Study
By Andrew P. Schissler
Cyprus Shoshone is an underground coal mine in southern Wyoming owned by Cyprus Coal Company, a subsidiary of Cyprus Minerals Company. To date, seven longwall panels have been extracted from the pitch
Jan 1, 1993
-
Overburden Failure Characteristics of Extra?Thick Seam Using Top Coal Caving Mining Method at Tongxin Coal Mine
By Zhijie Zhu
In order to determine the overburden failure characteristics of extra-thick seam mining, EH4 electromagnetic image system and borehole televiewer survey were applied to panel 8100, Tongxin coal mine.
Jan 1, 2014
-
Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining
By D. Bigby
The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa
Jan 1, 2005
-
Prediction of Roof Fall Rate in Coal Mines Using Fuzzy Logic
By Ebrahim Ghasemi
Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred
Jan 1, 2011
-
Selection of Pumpable Cribs for Longwall Gate and Bleeder Entries
By Alan A. Campoli
"Pumpable crib support for longwall gates and ventilation bleeder entries is becoming more prevalent in United States coal mines (Figure 1). The pumpable crib selection and spacing design has been gre
Jan 1, 2015
-
A New Rock Mass Failure Criteria Based On Rate Of Movement
By Hamid Maleki
A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved
Jan 1, 1990
-
Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems
By Robert M. Cox
Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These
Jan 1, 1994
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral Approach
By Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993
-
A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground
By Kevin W. Harris
Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif
Jan 1, 2014