  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Sub-Surface Cracks Due To Disc Cutter Spacing For Improved Rock Breakage And Ground Control (9409c703-a463-4470-b9b9-4f86b64581d4)

    By N. I. Aziz

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in th

    Jan 1, 1992

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • SME-ICGCM
    Displacement Discontinuity Method For Three-Dimensional Stress Analysis Of Tabular Excavations In Non-Homogeneous Rock (ff6cd480-c238-4f06-bf11-52c054cbd2e8)

    By Leigh J. Wardle

    This paper describes a numerical method for calculating the three¬-dimensional stresses and displacements induced by tabular excavations in a rock mass consisting of parallel layers of distinct mater

    Jan 1, 1984

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical Modeling

    By Dennis Dolinar

    In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a

    Jan 1, 2007

  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic Method

    By Shu Yan

    The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi

    Jan 1, 2005

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Meeting the Challenges of Floor and Sidewall Strata Control in UK Deep Coal Mines

    By Lorraine Kent

    Excessive floor and side deformation are major problems in deep coal mine entries in Europe, and in particular in the UK where rockbolt support is used at depths of working of around 3000 ft. This has

    Jan 1, 2014

  • SME-ICGCM
    Characterization of Internal Insertion Pressure During Installation of Fully Grouted Bolts

    By Luis Giraldo

    The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that

    Jan 1, 2006

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007

  • SME-ICGCM
    Assessment of surface fracture depth and intensity due to subsidence over the longwall panel using a sonic technique

    By A. W. Khair

    This paper presents an analysis of fracture depth and intensity due to subsidence over the longwall panel. Sonic reflection techniques were utilized to determine fracture depth, and a variation of p-w

    Jan 1, 1989

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?

    By Wouter Hartman

    Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int

    Jan 1, 2012

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996