Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance
By Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Bearing Capacity Of Piles Determined By Field Tests ? Synopsis
By D. M. Milovic
On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone
Jan 1, 2010
-
Prediction Of Ultimate Bearing Capacity Of Steel Pipe Pile By Wave Equation ? Synopsis
By R. G. Shen
The relation curve of strain and acceleration is presented in this paper. The steel pipe pile of 609.6 mm in external diameter driven by IDH-45 diesel motor hammer on the esturial shoal of Yangtze Riv
Jan 1, 2010
-
As-Built Analysis - An Integral Part Of Pile Foundation Design
By Dan Yang
Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit
Jan 1, 2010
-
Load Test On A Model Pile Driven Into Sand ? Summary
By A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?
By J. A. Hayes
For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d
Jan 1, 2003
-
Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective Piles
By A. K. Bhattacharya
Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo
Jan 1, 2009
-
Concrete Overbreak Estimation and Analysis Errors in Bored Piles
By Nuno Cruz
"The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before
Jan 1, 2017
-
Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis
By T. Soejima
In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me
Jan 1, 2010
-
Settelement Of A Piled-Raft Foundation Considering Lateral Pile Resistance
By Helen S. W. Chow
The use of piled raft foundations for tall buildings has been increasing in this decade as it is an economical alternative to conventional piled foundations. Piled rafts are composite structures compr
Jan 1, 2006
-
Numerical Analyses Of Pile Load Testing And Pile Base Grouting
By Wen-Chieh Cheng
Two bored piles with base grouting are loaded axially and the results are used to compare with numerical analyses. One compressive pile with a diameter of 2 meters is drilled through clay deposit and
Jan 1, 2006
-
Application Of PCC Piles On Soft Ground Improvement Of Expressways
By Hanlong Liu
The construction process and load-bearing behaviors of Cast-in-place Concrete Thin-wall Pipe Piles are analyzed based on its application on Yan-Tong Expressway project. The low strain test, static loa
Jan 1, 2006
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling
By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis
By M. A. El-Sohby
The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin
Jan 1, 2010
-
Experiences With Base Grouted Drilled Shafts In The Southeastern United States
By Steven D. Dapp
The use of base grouting (tip grouting) to enhance the axial capacity of drilled shaft foundations can achieve improvements in economy and reliability for many types of projects and soil profiles. Rec
Jan 1, 2006
-
Analysis Of Static And Dynamic Horizontal Load Tests On Steel Pipe Piles
By Pastsakom Kitiyodom
In order to estimate the deformation and load distribution of a single pile subjected to dynamic horizontal load as well as vertical load, a simplified method of three-dimensional numerical analysis,
Jan 1, 2006
-
An Approximate Nonlinear Analysis Of Vertically Loaded Piled Rafts In Layered Soils
By Seung-hoon Lee
The use of piled raft foundations has been considered as an economical alternative to conventional piled foundations because a portion of the applied load is carried by the raft in the design of piled
Jan 1, 2008
-
Harmonization and Status of Geotechnical Standards in Europe
By Trevor L. L. Orr
"AbstractThe background to the harmonization of geotechnical standards that has taken place in recent years in Europe has been the move to more economic and political integration following World War I
Jan 1, 2014
-
Analysis Of Piled Raft Foundation ? Synopsis
By Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
Bending Strength Of Threaded Micropile Connections
By Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007