Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • DFI
    Restoration Of Railway Embankment – A Case Study

    By Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee

    One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a

    Sep 1, 2022

  • DFI
    Emplacement Techniques: Impervious And Pervious Wall Construction ? Summary

    By Fred C. Schmednecht

    For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w

    Jan 1, 1999

  • DFI
    Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test

    By Liqun Liang

    Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and

    Jan 1, 2011

  • DFI
    An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In Sand

    By Giuliana A. Zelada

    This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature

    Jan 1, 2000

  • DFI
    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise

    Jan 1, 2014

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • DFI
    The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station

    By H. F. Cowie

    Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of

    Jan 1, 1989

  • DFI
    CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement

    By Fabrice Mathieu

    The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi

    Jan 1, 2006

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Technical Note Evolution Of Top Of Pile Measurement Techniques In Deep Foundation Static Load Testing

    By Jon Sinnreich

    Ensuring the accuracy of collected data during deep foundation static load tests is of paramount importance. Typically, pile head displacements are measured relative to a purpose-built reference syst

    Jan 1, 2009

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    New York City - A Review Of Various Foundation Problems And Solutions - Synopsis

    By Mel Febesh

    Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and

    Jan 1, 2000

  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • DFI
    An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & Construction

    By Abid O. Adekunte

    The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing

    Jan 1, 2008

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014