    Pillar Blasting at the Murray Mine

    In April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un

    Jan 1, 1963

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Thermal analysis and microstructural evaluation of intermetallic compounds formed during pre- and post-eutectic reactions in 319 aluminum alloy

    By S. G. Shabestari

    Thermal analysis is a tool that is generally employed to predict the structure of the alloy before the actual casting is carried out. By cooling a sample of the molten alloy and recording the temperat

    Jan 1, 2004

  • CIM
    The Effect of Fixed Work on Incentive Rates

    By Douglas A. Sloan

    AN INCENTIVE or bonus system of payment is commonly used for mine labour. The incentive rates are usually based on the variable units of production, such as dollars per foot of drift advance or cents

    Jan 1, 1958

  • CIM
    Reducing Drilling Noise in Roof Bolting Operation Through Rationalized Drilling

    By Y. Luo

    The rock breakage process in drilling is a main source of noise in roof bolting operations, especially when hard rocks are encountered. Proper control of drilling operation can provide an opportunity

    Aug 1, 2013

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    Effect of Heat Treatment on Microstructure and Mechanical Properties of Cast Al-Si-Cu-Mg Alloy with Micro Additions of Zr-Ti-V

    By S. K. Shaha, W. Kasprzak, D. L. Chen, J. Friedman, F. Czerwinski

    The role of solutionizing conditions within the T6 heat treatment of the cast Al-Si-Cu-Mg alloy with micro-additions of Zr-Ti-V was assessed in terms of their influence on microstructure and mechanica

    Jan 1, 2015

  • CIM
    Influence of Geological and Meteorological Factors on the Failure Mechanisms and Frequency of Rockfalls

    By J-P. Rossetti, A. Guerin, M. Jaboyedoff, L. Baillet, A. Mariscal, J. D'Amato, D. Hantz

    "The processes leading to the fall of rock compartments from rock walls are poorly known as well as their velocity. It ensues that quantitative prediction of the failure time for a rock compartment wh

    Jan 1, 2015

  • CIM
    Steam Genera ting and Power Plants, Company, Nova Scotia Light Limited

    By A. R. Harrington

    BEFORE discussing some of the technical aspects of the steam generating plants of Nova Scotia Light and Power Company, Limited, it might be of interest to go back through history and see the developme

    Jan 1, 1958

  • CIM
    Application of Net Carbonate Value Characterization Methods to Gard Guide Implementation

    By C. H. Bucknam

    Net carbonate value (NCV) characterization methods for acid generation potential measurement originated from studies on the Carlin Trend during the 1990's and have been subsequently standardized

    Jan 1, 2011

  • CIM
    Designing of the Grinding and Classification Systems for Increasing the Concentrate Iron Grade in 4th Production Plant at Golgohar Mining and Industrial Company

    By Jamal Jafari, Abbas Sam

    "The concentration of the fourth production line at Golgohar includes 66% iron with Blaine number of 500 cm2/g. For pelletizing process, the feed iron grade should be greater than 68% with minimum Bla

    Jan 1, 2016

  • CIM
    Characterization and Empirical Analysis of Block Caving Induced Surface Subsidence and Macro Deformations

    By K. Woo

    The increasing move to block cave mining methods (including sublevel and panel caving) to access deeper and lower grade ore deposits as near surface sources become exhausted raises questions as to the

    May 1, 2009

  • CIM
    Rope Maintenance on Drum Hoists

    By Burns Sutherland

    Although some mine hoisting systems incorporating steel wire ropes on drum hoists experience completely dependable performance on the hoist ropes for many years, other rope records illustrate an errat

    Jan 1, 1970

  • CIM
    Geotechnical Risks Affecting Pipelines - The Bolivia-Brazil Natural Gas Pipeline Experience

    By H. R. Oliveira, C. R. Aragonez de Vasconcellos

    Pipeline operation and maintenance necessarily involves geotechnical studies at points and areas with deflagrated instabilities or still to map and monitor areas prone to geotechnical problems. Landsl

    Jan 1, 2005

  • CIM
    Raglan project optimization and economics

    By T. F. Pugsley, D. Gignac

    "The historical background to the project dates back to the mid-30s with the discovery of surface sulphide showings in the Cape Smith-Wakeham Bay ultramafic belt. In the mid1950s, orderly exploration

    Jan 1, 1996

  • CIM
    Mineralogical Evaluation of Au-Sb-As Mineralization from the ADMW Zones, Clarence Stream Property, New Brunswick

    By Louis J. Cabri, Donald Hoy

    "Samples with contrasting gold mineralization were studied quantitatively prior to metallurgical tests. The AD samples are coarser-grained and characterized by abundant Sb minerals (jamesonite, berthi

    Jan 1, 2007

  • CIM
    The Past 70 Years of Flash Smelting

    By M. Lahtinen, P. Latostenmaa, I. Kojo, E. Peuraniemi, M. Lindgren, S. Jyrkönen, M. Jåfs

    The year 2019 marks the 70th anniversary of Flash Smelting. The technology was operated on industrial scale for the first time at the Outokumpu Harjavalta copper smelter in Finland in 1949. Since then

    Jan 1, 2019

  • CIM
    Development of Cable-Lok Anchor for Pre-stressed Cable Bolting and its Applications in Mines

    By Rocky (Yaokun) Wu

    This paper introduces the development and application of a new cable anchor - Cable-Lok for pre-stressed cable bolting in mines. Cable-Lok is a spring-loaded cable anchor suitable for the drill hole

    Oct 1, 2010

  • CIM
    Canmore mining operations

    By T. Patching

    "COAL MINING at Canmore, Alberta, began in 1886 and continued there until July 1979. A comprehensive review of the Canmore operations is not available, but the following notes have been prepared to ac

    Jan 1, 1985

  • CIM
    Flooding and loss of the Patience Lake potash mine

    By D. Gendzwill, N. Martin

    "In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou