Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modelling a semi-batch reactive precipitation of ferrihydrite

    By W. R. Richmond, T. S. Li, D. Ilievski

    The reactive precipitation of ferrihydrite was studied in a laboratory semi-batch precipitator, where a highly concentrated sodium hydroxide solution was fed into an iron nitrate solution. Instantaneo

    Jan 1, 2005

  • CIM
    Selective Recovery of Gold from E-Wastes by Using Cellulosic Wastes

    By B. B. Adhikari, S. Alam, Ohto Kawakita, Abe Pangeni

    Effective recovery of gold was investigated by using adsorption gels prepared from pure cellulose, cotton and paper by treating with concentrated sulfuric acid. Only gold was adsorbed with extraordina

    Jan 1, 2011

  • CIM
    Advanced Control Concepts for Mineral Dryers

    By J. C. Hawkins

    Determining moisture content and rate of flow of a solid product make measurement and control of dryers unusually difficult. This paper de-scribes a method of accomplishing this with readily made air-

    Jan 1, 1971

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    Converting the Key Lake Mill Process for McArthur River Ore

    "The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri

    Jan 1, 2001

  • CIM
    Use of the Latest Technology to Overcome the Demands of Mill Operation

    By Tatiana Ravani von Ow, Leandro Bomvisinho

    "The size of mills driven by ring-gear or by a gearless solution has significantly increased in the last years. This has created additional challenges for the driven equipment. The requirements for th

    Jan 1, 2010

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Discover Jansen

    By John Stubbs

    Sub-Surface Shaft excavation Mine development Headframes Surface Production facilities Product storage and loading Tailings area Infrastructure Discovery Lodge Utilities Operatio

    May 1, 2013

  • CIM
    The Changing Role of Hydrometallurgy

    By B. Meddings, O. J. I. Evans

    "This paper is mainly concerned with the present and probable future role of hydrometallurgy in the production of base metals.The economic and technological bases of the hydro-metallurgical plants bui

    Jan 1, 1971

  • CIM
    Diamond Recovery Technologies

    By John Lindsay

    Outline ??Recovery plant requirements and concepts ??Common recovery plant unit processes ??Recovery plant design considerations ??Peripheral issues Process Design ??Liberation ??Separation ??

    Apr 1, 2005

  • CIM
    Research into a New Method to Define the ?Three Zones? Above a Thick Coal Seam Mines Byfull-Height Extraction

    By Zhiqiang Wang

    This paper mainly focuses on the method of ?three-zone? definition (a caving zone, a fissure zone and a curve subsidence zone) for full height cutting in a thick seam. Based on criteria of a caving zo

    Aug 1, 2013

  • CIM
    The Flash Recycle System for the Cooling of Autoclaves Process Design and Operation

    By F. Crundwell, N. Steenekamp

    "The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle

    Jan 1, 2012

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    Research on Asbestos Fibres

    By M. S. Badollet

    Introduction Very little fundamental research has been done on asbestos fibre to cake maximum advantage of its properties and to determine in what commercial products it can best be utilized. Fo

    Jan 1, 1948

  • CIM
    A geological appraisal of the coal resources of Nova Scotia

    By Peter A. Hacquebard

    Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9

    Jan 1, 1979

  • CIM
    Geology and Economic Significance of Current and Future Rare Earth Element Sources

    By G. J. Simandl

    "Since the 1980s, China has become the predominant producer of REEs. Recently, it introduced REE export quotas and this started a world-scale REE exploration rush. REE resources are concentrated in ca

    Jan 1, 2012

  • CIM
    Caving and Subsidence at the Copper Mountain Mine

    By W. L. Nelson

    The orebodies at Copper Mounta1n lie along and within a few hundred feet of the contact of an intrusive stock of gabbro with a series of bedded volcanic rocks of the Nicola formation. These. orebodies

    Jan 1, 1950

  • CIM
    The Sherritt-Cominco Copper Process ? PART III : Commerical Implications

    By D. E. G. Maschmeyer

    The operation of the pilot plant for the S-C Copper Process during 1976 has provided the basic data for the design of a commercial-scale plant. This paper introduces the commercial aspects of the S-C

    Jan 1, 1978

  • CIM
    Development of an Air Permeability Test Method and Application to Underground Mining

    By S. Klemmer

    Potential problems associated with groundwater inflows are a major concern to many Saskatchewan mining operations. Rock mass behaviour and stability have been linked to groundwater inflow potential. A

    Nov 1, 2011