Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • CIM
    Distributions of Flow Characteristics and Physicochemical Properties of Acid Mine Drainage in a Settling Pond

    By Dong-kil Lee

    Field tests have been conducted to investigate the characteristics of flow and physical chemistry of acid mine drainage(AMD) in the Hwangji-Yuchang settling pond in south Korea. pH and ferrous concent

    May 1, 2011

  • CIM
    Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines

    By William Shaw

    Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de

    Oct 1, 2009

  • CIM
    Les Mines Selbaie Story Introduction

    By R. C. Bryce

    "Selbaie is located northwest of Joutel, in what is known as the fourth east-west volcanic sediment group in northwestern Quebec. The main metals produced are copper and zinc, with important contents

    Jan 1, 1990

  • CIM
    Geology and Chemistry of the El Abuelo Calcic Fe-skarn and Related Cu-(Ag)-Bearing Hydrothermal Veins, Chubut Province, Southern Argentina

    By R. E. de Barrio, M. E. Lanfranchini, R. O. Etcheverry

    "The El Abuelo Ca-Fe-magnetite skarn and related hydrothermal quartz veins are located at Cerro Pepita Hill, in southwestern Chubut province of southern Argentina, 1700 km southwest of Buenos Aires. T

    Jan 1, 2007

  • CIM
    Validation of High Fidelity Simulation Wear Predictions in Various Types of Mineral Processing Equipment

    By John A. Herbst, Xiangjun Qiu

    "Prediction of wear on a microscale level in mineral processing equipment turns out to be a challenging undertaking. This is particularly true for cases in which the objective is to use such predictio

    Jan 1, 2007

  • CIM
    Continuing Professional Education -The Answer To Technological Obsolescence

    By Lucien Piché

    "IN any opportunity such as I am now given, I suppose that one should not fail to say that what the world has to offer to this year's graduates in science and in engineering is the greatest promise ev

    Jan 1, 1966

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    New Type of Organically Capped Gold Nanoparticles prepared by Controlled Thermolysis of Gold Complexes

    By Masami Nakamoto

    Controlled thermolysis of gold(I) thiolate complex, [C14H29(CH3)3N][Au(SC12H25)2], at 180 °C for 5 h under an N2 atmosphere produces novel gold nanoparticles passivated by alkyl groups derived from th

    Oct 1, 2003

  • CIM
    Integrated Underground Mining and Processing Of Massive Sulphide Ores

    By Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber

    "It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min

    Jan 1, 2006

  • CIM
    No. 8 Shaft, Britannia Mines

    By Paul W. Billwiller

    Introduction In 1937, the Britannia Mining and Smelting Company, Limited, was carrying on an extensive exploratory diamond-drilling programme. Most of this drilling was done on the 4100 level, the

    Jan 1, 1946

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • CIM
    Canadian Energy Sources

    "THE CONCEPT of energy as a commodity, while not entirely new, is not as widespread as the importance of the idea to this modern world would lead one to expect. The growth in the supply and use of ene

    Jan 1, 1953

  • CIM
    Geochemical Control of Chromium, Vanadium, and Titanium Ore Deposits

    By H. D. B. Wilson

    "IntroductionRECENT ADVANCES in geo-chemistry and in •our knowledge •of crystal structure provide a key which enables us to create a systematic picture of the genesis of many ore deposits. This geneti

    Jan 1, 1953

  • CIM
    Sustainable innovation in underground hardrock mining technology

    By A. Bamber

    Canadian leadership in a global mining context will depend not only on entrepreneurship and best practice but also on technological innovation. This paper argues for more ambition and commitment to R&

    Jan 1, 2005

  • CIM
    Suggested Support System for a Mining Tunnel in the E1 Longwall Panel of the Parvade1 Underground Coal Mine: The Finite Element Method

    By B. Oraee-Mirzamani

    One the most important tasks after excavation of tunnels is the implementation and installation of a support system. Tunnel collapse poses a safety hazard and can cause worker injuries. In addition, i

    Aug 1, 2013

  • CIM
    Danieli?s Entry into Direct Reduction with its Danarex®

    By Alim Ullah

    Danieli entered into the Direct Reduction (DR) field in order to offer its clients complete turnkey facilities for steelmaking?from processing of raw materials through finished products. The Danarex®

    May 1, 2003

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    May 1, 2009

  • CIM
    The Griffith Mine Story

    By F. P. Morawski, J. E. Schelske, J. R. Geddes, B. R. Eberts, D. M. Wilson, J. D. Jeffries

    "The Griffith Mine is located 200 miles northeast of Winnipeg and is 30 miles south of Red Lake, Ontario. Owned by The Steel Company of Canada Limited and managed by Pickands Mather & Co., it has an a

    Jan 1, 1970

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003