    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • CIM
    The Limitations of Activated Carbon in CIL Circuits Handling Preg Robbing Solids

    By Yeonuk Choi, Gus Van Weert

    "In regular CIL circuits, activated carbon is used for two purposes: avoiding solid/liquid separation after cyanide leaching, and minimizing gold losses in the tails. The carbon distribution and gold

    Jan 1, 2012

  • CIM
    The Use of Enhanced Gravity Concentration for Precious Metal Recovery

    By Steve McAlister, Colin Sprake

    "Enhanced gravity concentration machines have been applied successfully in the following areas of precious metal recovery flowsheets:1. Primary Grinding Circuits2. Shaking Table Tailings3. Pre-Concent

    Jan 1, 2003

  • CIM
    Joining Geomechanical and Geophysical Monitoring at Coal and Ore Mines

    By V. V. Zubkov

    The systems of geophysical monitoring have been already put into operation at coal mines and ore mines. Since at present it is rather difficult to conduct mine experiments; it is necessary to start a

    Aug 1, 2013

  • CIM
    Water Problems in the Cape Breton Coal Mining Districts

    By J. L. Bowlby

    Introduction In the following discussion, boiler-feed and mine waters will be considered from the point of view of the problems arising from the chemical nature of the mineral and gaseous impurities

    Jan 1, 1934

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass Under High in-Situ Stress of Model Test and Damage Constitutive Relation

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    "The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under h

    Jan 1, 2015

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • CIM
    Reducing Dust from Leyner Drills

    By R. J. Craig

    Introduction All mining operations produce rock dust. Inhalation of rock dust, particularly if it has a high silica content, causes silicosis. Silicosis is, therefore, recognized as a hazard of th

    Jan 1, 1947

  • CIM
    Computer Vision Applied to Corrosion Evaluation on Pipe Radiographs

    By M. Brochu

    In this paper, we present a computer-vision approach developed for wall-thickness measurements of corroded pipes inspected by double-wall radiography. The main objective of the work is to optimize dat

    Jan 1, 2005

  • CIM
    Galvanic Interaction and Particle Size Effects in Self-Heating of Sulphide Mixtures

    By Jan E. Nesset, James A. Finch, Frank Rosenblum, Rebecca Payant

    "Under certain conditions of moisture and oxygen, sulphides can spontaneously heat, a phenomenon known as self-heating. In this paper, we test a hypothesis that galvanic interaction between some sulph

    Jan 1, 2011

  • CIM
    Galore Creek Project

    Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag

    May 1, 2006

  • CIM
    New Miner Training Program

    By Denis Beaudoin

    Program Basics: Goals, Course Content & Training Process Sudbury: History of the Program & Lessons Learned Diavik: History of the Program & Lessons Learned Most Recent Program: Totten Mine in partn

    Oct 1, 2010

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • CIM
    Financing considerations for the industrial minerals sector

    By Robert Halupka

    The industrial minerals sector represents a broad range of products involving a variety of technologies serving a diversity of markets and end uses. Unit values of products vary widely, reflecting the

    Jan 1, 2001

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002