Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Equipment problems and their resolutions

    By W. D. Watson

    "Early in mine development at Quintette Coal Limited major problems were encountered with the fleets of primary equipment which seriously hampered production. These major fleets (cable shovels, hydrau

    Jan 1, 1988

  • CIM
    Dynamic wetting spread factors and interfacial heat transfer coefficients in the solidification of aluminum droplets on copper substrates

    By D. -A Tremblay

    Dynamic wetting spread factors and interfacial heat transfer coefficients were determined for aluminum droplets solidifying on copper substrates, The spread factors were determined from the droplet ge

    Jan 1, 2005

  • CIM
    Determination of Silver Bearing Minerals in the Lady Loretta ore

    By Donald Leroux, Dave Scott, Giovanni Di Prisco

    "The Lady Loretta lead-zinc deposit in Northwest Queensland, Australia contains an average of 5.9% lead, 17.1% zinc and 97 g/t silver. Ore mineralization is mostly comprised of fairly complex intergro

    Jan 1, 2002

  • CIM
    The Hematite Process - New Concepts for Increased Throughput and Clean Hematite Production

    By T. C. Cheng, G. P. Demopoulos

    It is the object of this paper to discuss various options for improving the hematite process in terms of increased throughput hence lower capital cost and production of saleable quality hematite. With

    Jan 1, 2004

  • CIM
    A Look at Grinding

    By V. Dinesen

    "Grinding is simply the function of reducing particles in size or creating new surface areas. This may be accomplished by many means but we will only concern ourselves with the continuous grinding pro

    Jan 1, 1972

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Total Plant Control by a Process Computer at Quebec Cartier?s Mount Wright Property

    By G. Bourque

    One of the design criteria for the Mount Wright facilities was to incorporate the latest proven automation techniques and devices for the new crushing, grinding and concentrating plant. The heart of

    Jan 1, 1977

  • CIM
    AOSTRA's underground test facility (UTF): mine-assisted recovery under difficult conditions

    By J. C. O'Rourke

    "This paper presents an overview of Alberta Oil Sands Technology Research Authority's in situ oil sands recovery project at its underground test facility near Fort McMurray. It covers the rationa

    Jan 1, 1989

  • CIM
    Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault

    By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak

    "By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important

    Jan 1, 2009

  • CIM
    Repairs of Brunswick Mining, Smelting and Fertilizer concentrate and bulk handling system

    By D. T. Aikens, R. Gaudreault

    "This paper summarizes structural repairs carried out on a marine wharf consisting of six 13.7 m by 13.7 m reinforced concrete cribs linked together by five 14.6 m long beam spans. As a result of prob

    Jan 1, 1988

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    Applying tracer gas techniques to evaluate the air distribution in flood leaching stopes

    By A. Sheikh, S. Hardcastle

    "Various methods of leaching are being used by Denison Mines Ltd. Uranium Operations. This study was designed to investigate the flood leaching operation of two parallel inter-connected stopes contain

    Jan 1, 1988

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002

  • CIM
    Environmental and Reclamation Measures at Equity Silver Mines Ltd.

    By J. Patterson

    "Acid Mine Drainage (A.M.D.) formed from oxidation of disposed pyritic wastes presents a potential pollution hazard for Equity Silver Mines Limited and the mining industry in general. Failure to colle

    Jan 1, 1988

  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    General Discussion - Impurity Penalties in Smelter Contracts

    By G. C. McKerrow

    "Mr. G.C. McKerrow, Assistant Manager of Noranda Mines and formerly Smelter Superintendent attended the meeting to answer questions as to why smelters imposed penalties for too much zinc in a copper c

    Jan 1, 1971

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    Experiences on Process Control Computers at the Concentrator of Outokumpu Oy

    By Olli Aulio, Outokumpu Oy

    "GENERALThe Outokumpu Company is today an important European producer of metals from its own mines: copper nickel cobalt, ferro chrome and zinc being the main products. In 1972 about 4 million tons of

    Jan 1, 1973