Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Lessons Learned from the East Malartic FireBy T. V. Nethery
Introduction A brief account of the East Malartic fire is essential if this paper is to serve the purpose implied by its title. The fire originated in the timbers of No. 4 shaft at the 10th, or
Jan 1, 1950
-
Ergonomic Intervention Through the Design of Jumbo Drill Rigs and its Effect on Cost Savings and Workers Health and SafetyBy Cindy Schiewek
Industrial injury occurrences are an ongoing concern for Mine Operators. Along with the personal suffering of injured workers comes an increase in compensation and productivity costs. Growing recognit
May 1, 2003
-
Major Bulk Loading and Storage Facilities at Port Moody, B. C.By A. H. Harvey, M. Delangen, A. D. Fernie
"A large-scale expansion to Pacific Coast Bulk Terminals Ltd. has now been completed and placed in operation. The original plant, built approximately eight years ago, consists of the direct rail-car t
Jan 1, 1969
-
Mining Mineral Processing Simultaneous Planning The Work Index ValueBy J. A. Caceres
Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average
May 1, 2003
-
Observation of Ore Pass System Performance at Brunswick MineBrunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio
Feb 1, 2008
-
The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine ProjectBy Roger Payne, John R. Goode, Feng Gao, James Brown
The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific
Jan 1, 2014
-
The Recovery of Gold From Low Grade and Refractory Ores What's Next?By P. D. Kondos, J. R. Goode
Given the global inventory of low grade and refractory gold deposits, processes that could turn these challenged deposits into mines are of considerable interest. Such gold deposits have low value and
Jan 1, 2005
-
Iron Control in Mineral Processing (2fd76e37-d28e-4a6e-89ca-f817ec26c15b)By J. E. Nesset, S. R. Rao, J. A. Finch
"For base metal sulphides, iron rejection starts in mineral processing. This review focuses on changes in plant practice specifically to improve iron sulphide rejection by control of contaminant ion e
Jan 1, 2007
-
Investigation into Iron Ore Concentrate Moisture IssuesBy T. Holmes, D. C. Russell, G. Jolly
"The AMEC Oakville office is involved in the design and construction of an iron ore concentrator located in Liberia. Currently, the site ships Direct Shipped Ore (DSO) to overseas customers. The DSO m
Jan 1, 2014
-
Pressed and Sintered Iron Powders: A Study of the Effect of Particle Size Distribution on Their Physical PropertiesBy W. Rostoker
Packing Experiments The porosity and most of the other physical properties of a coherent mass of any material built up by the packing together of discrete particles will obviously vary with, and be
Jan 1, 1947
-
Tyrethane for Screening FabricationBy S. L. Aaroe
"TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove
Jan 1, 1976
-
Improving Concentrate Grade through Smart Design and PilotingBy T. Strong
"Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo
Jan 1, 2017
-
A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, NunavutBy K. Muehlenbachs, J. U. Stemler
"Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary
Jan 1, 2006
-
VXP2500 Stirred Mill Optimization at Casmyn Mining Turk MineBy D. Rahal, I. Shah, B. Hines, S. Reddick
"The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi
Jan 1, 2014
-
Feldspar in CanadaBy O. D. Maurice
Feldspar mining in Canada came to an end during 1972 after many years of continuous activity. The deposits are not exhausted and the domestic demand for this product is expected to continue at about t
Jan 1, 1973
-
Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BCBy Ed Beswick
Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design
May 1, 2008
-
Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral ProcessorsBy D. M. Doyle
"The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this
Jan 1, 1974
-
Operation of a Gold Extraction Circuit for Recovery of Gold from Uranium Mill Tailings at Cluff Lake, Saskatchewan (78ae3e82-f2cf-45b8-b7b7-209d077156f6)By L. A. Melis, J. W. Rowson
"Cluff Mining operates the Phase II uranium mine and mill at Cluff Lake, northern Saskatchewan. During the Phase I operation, uranium tailings were generated by acid leaching of a gravity concentrate
Jan 1, 1988
-
Tonnage Oxygen Use in Gold Leaching"Air Products approached LAC Minerals in 1987 to initiate trials with pure oxygen in the leach circuit at several LAC facilities in Canada. This paper gives an overview of oxygen use and covers specif
Jan 1, 1990
-
Distribution Ratios of Platinium Group Metals Between Al2O3-CaO-SiO2 or FeO-CaO-SiO2 Slag Systems and Molten IronBy K. Yamaguchi, Sekimoto. H.
"Platinum Group Metals (PGMs) used as catalyst which reduces toxic substances in emission gas exhausted from an automobile should extensively be recycled because they are rare metals produced only at
Jan 1, 2014