Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of Continuous Materials Handling Equipment in an Open Cut Iron Ore Mine

    The scarcity of truck tyres combined with decreases in the availability of labour, increases in fuel costs and a buoyant international economy driving project budget blowouts, have all combined to cha

    Jan 1, 2007

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Potential for Future Developments Outside of Existing Fields in the Gippsland Basin

    By MacLean L

    In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate

    Jan 1, 1982

  • AUSIMM
    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Hydraulic Backfilling At Homestake

    The hydraulic backfilling of mine tailings has proven very successful at the Homestake Mine in Lead, South Dakota. It allows greater versatility, selectivity and safety in mining. It has also mini

    Jan 1, 1973

  • AUSIMM
    Structural Controls and Strain Partitioning in the Red October Gold Mine, Western Australia

    By D Howe, J Conn, J G. McLellan, K Gates

    The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean

    Aug 18, 2014

  • AUSIMM
    Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not Compliance

    By A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon

    Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant

    Jul 10, 2012

  • AUSIMM
    Pacific Rim of Australia: The 600 Million Year Partnership of Gondwanaland and the Ocean

    The eastern third of Australia contains an unrivalled Phanerozoic rock record generated by the regional interaction of Gondwanaland with the Pacific and by the global effect of the 400 m.y. Pangaea -

    Jan 1, 1990

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Integrated Drill and Shovel Performance Monitoring Towards Blast Optimization

    By Scoble M, Peck J

    This paper reviews the instrumentation and monitoring of blasthole drills and electric mining shovels at a surface coal mine in western Canada. The drill monitoring component involved the developmen

    Jan 1, 1990

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    New perspectives in iron ore flotation – from fundamental studies to on-site pilot testing

    By L O. Filippov, A Piçarra, I V. Filippova, N P. Lima, K Silva

    The reverse cationic flotation using the starch as depressor of iron oxides is the most efficient upgrading process when is applied to the simple systems composed by hematite/magnetite and quartz. The

    Aug 24, 2022

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin Coal

    By C Hedemann, N Silveste, H Davis, C J. Moran

    For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic

    Jan 1, 2006

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    Real Option Value Optimisation

    By J Gould, T Elkington

    Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr

    May 24, 2012