Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Mineral Industry in a Changing World

    By A J LYNCH

    It was Harold McMillan, Prime Minister of England 30 years ago, who used the phrase "The Wind of Change" to describe political events in Africa in his day. So well did this phrase capture the spiri

    Jan 1, 1989

  • AUSIMM
    Water as Risk in Mining – Media Analysis and the RISKGATE Body of Knowledge

    By J Harris, M Shi, S Vink, P A. Kirsch

    Across the life-of-mine, water is both an essential commodity to mining, and one of the most significant hazards. In Australia, a land of drought and floods, availability of water is a critical strate

    Jul 16, 2014

  • AUSIMM
    Channel Iron Deposits - A Major New District Around the Caliwingina Creek, Central Hamersley Ranges,Western Australia

    By T Gill, A Faragher, B Scott, V Kakebeeke

    In 2000, after six year intensive exploration for high-grade haematite deposits, Rio Tinto included the channel iron deposits (CID) as a specific iron ore target in the Hamersley Province iron ore exp

    Jan 1, 2009

  • AUSIMM
    Automated Open-Cast Scheduling Systems ù the Namakwa Sands Solution

    Brand se Baai, on the North-Western Cape Coastline of Southern Africa, is the site of the Namakwa Sands Limited Heavy Mineral Sands Mining Operation. The mine is a 14 000 000 tonnes per annum open-cas

    Jan 1, 2003

  • AUSIMM
    Examination of Bit Wear in Rock Drilling Through Wavelet Analysis

    Laboratory tests were conducted to study the effects of thrust or pull-down force and rotary speed on the vibration signatures of a particular drill in a known rock type, and to determine how the vibr

    Jan 1, 2000

  • AUSIMM
    Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?

    By Williams P. A

    Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and

    Jan 1, 1992

  • AUSIMM
    Refurbishment of Brisbane's Rail Tunnels for Electrification

    By Fejes G

    An integral part of the Brisbane Suburban Railway Electrification involved the relining, refurbishment and track lowering in the Roma Street, Brunswick Street and Gloucester Street double track tu

    Jan 1, 1981

  • AUSIMM
    Carburisation and melting of hot compacted iron in a coke bed

    By M Kim, J Park, I-K Suh, E Kim, J Lee

    One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp

    Aug 21, 2024

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Wetting and drying cycles as a means to determine the effect and consequences of tailings ageing

    By T Baumgartl, R Akesseh, M Edraki, B Usher, M Shaygan

    With the continuing demand for industrialisation and urbanisation, the rate of mining and processing lower grade ores will also increase, producing large quantities of waste. As extreme weather events

    Jul 25, 2018

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Getting Value From R&D

    New knowledge has no economic value unless it can be applied, or æcapturedÆ, as the R&D jargon has it. Australia probably spends more than $500 m per year on mineral industry R&D, distributed amongst

    Jan 1, 1998

  • AUSIMM
    Morphological Characterisation of Spongillites from South-Eastern Brazil

    By A F. D C Varajpo, R C. Weba, C Volkmer-Ribeiro, C A. C Varajpo, N S. Gomes

    This study relates to the spongillite deposits from the region of Jopo Pinheiro, in the north-west of the State of Minas Gerais, south-eastern Brazil. The deposits occur in shallow ponds (with a maxim

    Jan 1, 2008

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast Operations

    By D P. Blair

    Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati

    Nov 8, 2011

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Development of Face Machinery with Particular Reference to Shortwall Mining

    By Duncan B

    Shortwall continuous mining as first introduced at Burwood colliery, and currently being used at John Darling, Lambton, and Corrimal collieries, is a method of coal winning which was pioneered in

    Jan 1, 1972