Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Development of a CADD Mine Design SystemBy Gill L. F, Gleeson HB
This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available
Jan 1, 1989
-
The Professional Standards Act - A New Approach to Dealing with Professional LiabilityThe Professional Standards Act responds to the growing problem of professional liability by introducing a mechanism whereby professional associations can have schemes approved. Those schemes includ
Jan 1, 1995
-
Managing mining fatality riskBy P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan
The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th
Apr 16, 2024
-
Quantifying the energy efficiency transformation at Cadia due to HPGR crushingBy J Seppelt, G S. Lane, E Wang
Newcrest’s Cadia concentrator operated from 1998 to 2012 with a traditional SABC grinding circuit treating Cadia open pit ore. The Cadia comminution circuit was well characterised through surveys and
Aug 29, 2018
-
Characterisation of Bedded and Channel Iron Ore Deposits Using CSIRO’s HyLogging™ SystemsBy M Haest
This study demonstrates the application of HyLogging™ technologies for mineralogical characterisation of different iron ore types throughout the Hamersley Province (Western Australia), including a cha
Jul 11, 2011
-
Mining and Sustainability - Placer Niugini LimitedCan mining promote sustainable development? What is sustainable development? Is sustainable development good for corporate sustainability? Does it work in practice? If so, is it good for business? Thi
Jan 1, 1999
-
Development of Robot System for Automatic Assembling of Bolted SegmentsBy Harada M, Katsuta S
In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed
Jan 1, 1987
-
What Causes Cracks in Rock Blasting?By S Nie, I Bergqvist, F Ouchterlony
In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial
Jan 1, 2001
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed
Jan 1, 1995
-
Utilisation of energy sources other than coke in the sintering processBy T Higuchi, K Fukada, K Takehara, Y Iwami, S Fujiwara
Following the Paris Agreement adopted in 2015 and the SDGs, reduction of CO2 emissions has been taken up as an issue worldwide, and the steel industry, which has a particularly large emission, is requ
Nov 8, 2021
-
Water ù The New Precious Resource: Planning, Management and Allocation Queensland-StyleBy G Milligan
This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s
Jan 1, 2003
-
Advanced mine to mill application at the Barrick Cortez mineBy J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic
The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line
Aug 29, 2018
-
Pyrometallurgical process simulations using CALPHAD thermodynamic databasesBy M-A Van Ende, N Kumar, I-H Jung
In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio
Aug 21, 2024
-
Geochemistry Contributing to the Rehabilitation of the Wismut Uranium Mines, GermanyBy Brown P. L
A study has been made of the geochemistry of the Ronneburg mine district as input to the overall management strategy for the rehabilitation of the mine site. The study drew on the geological data an
Jan 1, 1995
-
Fan Locations - A View in HindsightBy D Chalmers
"There is a tendency to treat mine roadways with fan installations as leak proof systems. Morecomplex ventilation arrangements are being installed in coal mines out of necessity or designand these can
Jun 1, 2012
-
Technical Data Management for MinesComputers are playing an increasing role in the management of technical data in mines. Companies are re-assessing the role of their data processing departments as users demand computer resources i
Jan 1, 1980
-
Five years of cover performance monitoring and modelling for a store and release cover at Century MineBy T Rohde, P Defferrard
In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo
Jul 23, 2018
-
Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope GeochemistryBy H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge
Mar 18, 2015
-
Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with RefluxBy Iley J. D, Siviour N. g, Moffatt R. J
The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p
Jan 1, 1989
-
Fine grinding circuit process improvement at the Karara mine concentratorBy H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy
The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag
Sep 11, 2017