Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development of a CADD Mine Design System

    By Gill L. F, Gleeson HB

    This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available

    Jan 1, 1989

  • AUSIMM
    The Professional Standards Act - A New Approach to Dealing with Professional Liability

    The Professional Standards Act responds to the growing problem of professional liability by introducing a mechanism whereby professional associations can have schemes approved. Those schemes includ

    Jan 1, 1995

  • AUSIMM
    Managing mining fatality risk

    By P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan

    The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th

    Apr 16, 2024

  • AUSIMM
    Quantifying the energy efficiency transformation at Cadia due to HPGR crushing

    By J Seppelt, G S. Lane, E Wang

    Newcrest’s Cadia concentrator operated from 1998 to 2012 with a traditional SABC grinding circuit treating Cadia open pit ore. The Cadia comminution circuit was well characterised through surveys and

    Aug 29, 2018

  • AUSIMM
    Characterisation of Bedded and Channel Iron Ore Deposits Using CSIRO’s HyLogging™ Systems

    By M Haest

    This study demonstrates the application of HyLogging™ technologies for mineralogical characterisation of different iron ore types throughout the Hamersley Province (Western Australia), including a cha

    Jul 11, 2011

  • AUSIMM
    Mining and Sustainability - Placer Niugini Limited

    Can mining promote sustainable development? What is sustainable development? Is sustainable development good for corporate sustainability? Does it work in practice? If so, is it good for business? Thi

    Jan 1, 1999

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    What Causes Cracks in Rock Blasting?

    By S Nie, I Bergqvist, F Ouchterlony

    In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial

    Jan 1, 2001

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed

    Jan 1, 1995

  • AUSIMM
    Utilisation of energy sources other than coke in the sintering process

    By T Higuchi, K Fukada, K Takehara, Y Iwami, S Fujiwara

    Following the Paris Agreement adopted in 2015 and the SDGs, reduction of CO2 emissions has been taken up as an issue worldwide, and the steel industry, which has a particularly large emission, is requ

    Nov 8, 2021

  • AUSIMM
    Water ù The New Precious Resource: Planning, Management and Allocation Queensland-Style

    By G Milligan

    This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s

    Jan 1, 2003

  • AUSIMM
    Advanced mine to mill application at the Barrick Cortez mine

    By J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic

    The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line

    Aug 29, 2018

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    Geochemistry Contributing to the Rehabilitation of the Wismut Uranium Mines, Germany

    By Brown P. L

    A study has been made of the geochemistry of the Ronneburg mine district as input to the overall management strategy for the rehabilitation of the mine site. The study drew on the geological data an

    Jan 1, 1995

  • AUSIMM
    Fan Locations - A View in Hindsight

    By D Chalmers

    "There is a tendency to treat mine roadways with fan installations as leak proof systems. Morecomplex ventilation arrangements are being installed in coal mines out of necessity or designand these can

    Jun 1, 2012

  • AUSIMM
    Technical Data Management for Mines

    Computers are playing an increasing role in the management of technical data in mines. Companies are re-assessing the role of their data processing departments as users demand computer resources i

    Jan 1, 1980

  • AUSIMM
    Five years of cover performance monitoring and modelling for a store and release cover at Century Mine

    By T Rohde, P Defferrard

    In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo

    Jul 23, 2018

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    Fine grinding circuit process improvement at the Karara mine concentrator

    By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy

    The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag

    Sep 11, 2017