Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-115(2)-76 Technical And Economic Study Of The Modified In Situ Process For Oil Shale - Vol. II - AppendicesBy James L. Ash
This report contains the results of a technical and economic evaluation of conceptual systems for the underground mining, rubblization; and in situ retorting of deep oil shale deposits. Study efforts
Jan 1, 1976
-
OFR-53-78 Revegetation Of Anthracite Refuse Banks With Municipal Sewage Effluent And Sludge: Phase IIBy William E. Sopper
Heat-dried municipal sludge was applied to a barren burned anthracite refuse bank in 1974. Sludge was applied at rates of 0, 40, 75, and 150 dry metric tons per hectare" Ten species of trees were plan
Jan 1, 1978
-
Fractal Feature Research on Impact Fragments of Coalmine Deep RockBy Xiaozhu Chen, Qi Ping, Pu Yuan, Qinyong Ma
"In order to investigate the fractal feature of coalmine deep rock fragments under impact loads, variable cross-section split Hopkinson pressure bar apparatus, 50 mm in diameter, was adopted to conduc
Jan 1, 2015
-
A Study of the Capillary Pressure.-Hydrodynamic Relationship to Soil Accumulation in Stratigraphie TrapsBy Ben Habermann
"The object of the work described in this paper was to increase the understanding of the relation that capillary pressure of a rock, hydro-dynamics, and accumulation of oil in stratigraphie traps have
Jan 1, 1960
-
Nodular organic matter in granites: implications for the origin of "kerogen" in the Witwatersrand Basin, South AfricaBy D. W. Davis, P. Landais, L. J. Robb
Abstract -Nodules of carbonaceous matter have been observed in several Archaean peraluminous granites adjoining the gold- and uranium-bearing Witwatersrand Basin. These nodules, which resemble solid b
Jan 1, 1994
-
Technology Development For Making Harmless The Incinerator Fly Ash And Recycling It As Construction Aggregate By RoastingBy Mototsugu Matsuno
A new process has been developed to treat fly ash generated from municipal incinerators, which contains not only toxic metals such as lead and cadmium, but also dioxins. The process includes the follo
Jan 1, 2003
-
OFR-165-83 Development Of A Nondestructive Test Device For Friction Rock SupportsBy R. Lusignea
A device has been developed for nondestructive testing the holding power of split tube friction rock supports. It operates by measuring the amount of decrease in internal volume when the support is fo
Jan 1, 1983
-
The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken RockBy T. G. Joseph
A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi
May 1, 2002
-
The Production of Cement in AustraliaBy Benkendorff P. N
Cement production in Australia approximates 6.5 million tonnes per year. Cement clinker is sourced from 15 plants which operate 28 kilns. Cement grinding is conducted at 14 of the clinker plants
Jan 1, 1989
-
Sulfur And Oxygen Partial Pressure Ratios Prediction In Copper Flash Smelting Plants Using Reddy-Blander ModelBy Bora Derin
The partial pressure ratios of sulfur and oxygen for several copper flash smelting plants were derived using the Reddy-Blander (RB) model and predicted dissolved sulfur contents available in the liter
Jan 1, 2003
-
RI 9207 - Fire Endurance of Mine StoppingsBy D. Ng
A facility to evaluate the fire endurance of mine stoppings was constructed by the Bureau of Mines in the multiple entry section of the Bruceton (PA) Experimental Mine. Stoppings up to 6 by 18 ft can
Jan 1, 1988
-
Drying of Fine Coal in Entrained and Fluidized StateBy E. O. Wagner, V. F. Parry
This paper summarizes investigations during 1949 on three pilot plants for drying low-rank fine cool by entrainment in hot gases. Detailed operating results on processing seven coals having moisture r
Jan 1, 1950
-
Determining Ore Breakage Characteristics using the Steel Wheel Abrasion TestBy Tapiwa Chenje, Victor Olivas, Peter Radziszewski
"Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device
Jan 1, 2011
-
Block/panel caving pressing final open pit limitBy S. Fuentes, J. Cáceres
"During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p
Jan 1, 2004
-
Roof Monitoring Helps Prevent Injuries in Stone MinesBy A. T. Iannacchione
From 1990 to 1996, 16 states reported 92 injuries from falls of roof, rib or face in the more than 90 underground stone mines in the United States (Fig.1). Missouri, Pennsylvania and Kentucky account
Jan 1, 2000
-
The Development and Application of Polyurethane Injectable Cable BoltsBy Dakota D. Faulkner
Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United
Jan 1, 2012
-
OFR-203-83 Coupled-Transport Membranes For Metal Separations - Phase VBy W. C. Babcock
This report covers Phase V of .a continuing program to apply a new liquid membrane process called coupled transport to the recovery pf metals from hydrometallurgical leach solutions. During this phase
Jan 1, 1983
-
Sustainability Rise through Process Improvement from the Industrial Revolution to the PresentBy H. J. McQueen
Mineral and energy resource consumption were continuously reduced by process improvements as chemical understanding was developed and applied. During the past two centuries, technological improvements
Jan 1, 2012
-
Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United StatesBy Giovanni A. Bonita
The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct
Jan 1, 2006
-
In Situ Rock Deformability Tests at the Rocky Mountain Pumped Hydro ProjectBy Nick Barton, Khosrow Bakhtar
Two plate load tests of 1 m2 area were per- formed in a pressure tunnel at the Rocky Mountain Pumped Hydro Project. Reaction for the 250 tons loading in this 10.5 meter diameter tunnel was provided by
Jan 1, 1986