Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    BORE Bolt: No Milled Notch? No Hot Notch? No Problem

    By Stephen C. Tadolini, Anand Bhagwat

    "Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens

    Jan 1, 2018

  • SME-ICGCM
    Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine

    By J. B. Lizak

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover

    By David F. Gearhart

    A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha

    Jan 1, 2014

  • SME-ICGCM
    Field Measurements of Overburden Strata Deformation Response to Longwall Mining

    By Xinzhi (Thomas) Du

    "In order to monitor the overburden strata deformation over a longwall mining area in the Pittsburgh Coal Seam, three boreholes were drilled across the longwall panel. Each borehole employed multiple-

    Jan 1, 2018

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006

  • SME-ICGCM
    Moisture–Induced Swelling of Illinois Mine Roof Shales: A Visualized Method

    By Long Fan, Shimin Liu, Guijie Sang

    "Weak shale roof falls have long been the main cause for fatalities in underground coal mines. Moisture-induced swelling is one of the root causes for the degradation of roof shales. In this study, sl

    Jan 1, 2017

  • SME-ICGCM
    Coal Bumps in an Eastern Kentucky Coal Mine 1989 to 1997

    By John Hoelle

    Coal mines in southern West Virginia, south-western Virginia and eastern Kentucky have experienced coal bumps at least since 1933. Most of the bumps have occurred due to high cover, strong roof and f

    Jan 1, 2008

  • SME-ICGCM
    The Quasi-Protection-Layer Model and Its Mechanisms of Gas Drainage

    By Liu Xiao, Lin Xiaoying, Ma Geng, Tao Yunqi

    "The soft coal in China has several issues, low permeability, high gas content and prone to gas outburst, making it difficult to drill and improve its permeability. Using the rock mass loading test, t

    Jan 1, 2016

  • SME-ICGCM
    The Prediction of Pillar Interaction Effects for Deep Multi-Seam Workings

    By Lightfoot. Nicholas, Na Liu

    "Mining in multi-seam workings has been undertaken for many years in the VK Remnant pillars above and/or below current working areas have an important influence on retreat gateroad conditions at five

    Jan 1, 2010

  • SME-ICGCM
    Application of Thin Spray on Liner (Masterseal) at Longwall T-Junction Sections in German Hard Coal Mines

    By Uwe Wyink, Guenther Thiele, Isabel Gollnick, Klaus Thyrock

    "The application of a thin spray on liner was implemented in longwall T-junction sections in 2009 for the first time. The development of the material and the application is based on a technical cooper

    Jan 1, 2010

  • SME-ICGCM
    Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry

    By Peter Fischer

    Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Geomechanical and Weathering Properties of Weak Roof Shales in Coal Mines

    By Hakan Gurgenli

    Many coal seams have weak shale immediate roofs that cause ground control problems. Therefore, it is important to know the properties of these shales so that preventive measures can be developed in a

    Jan 1, 2006

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Extending the Limits of Strata Bolting by the Use of Flexible Strand Rockbolts

    By Dennis R. Barratt

    Rockbolting is now used extensively as a method of primary support in UK coalmines. Over the past fifteen years an optimum bolting system has evolved, based on a high grade steel bolt and a very stro

    Jan 1, 1997

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Multiple–seam mining in the United States: An Analysis of Multiple Seam Stability in Northern Appalachian Coal Mines with Minimal Depth of Cover and Interburden

    By Michael J. Castner

    "INTRODUCTIONMultiple-seam mining is an ever growing concern for engineers and mine management in every portion of the mining industry and is especially true for coal mining operations. The goal of th

    Jan 1, 2015