Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall Recovery

    By Thomas A. Bailey

    Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c

    Jan 1, 2006

  • SME-ICGCM
    Truss Systems For Longwall Tailgate Support - Update

    By John C. Stankus

    At the 13th Conference on Ground Control in Mining, a paper was presented detailing a successful test in which a new truss system was utilized, in lieu of wood cribs, for tailgate support in the Pitts

    Jan 1, 1995

  • SME-ICGCM
    Load Capacity and Bond Behavior of Resin Grouted Rock Bolts

    By Nic Slatalla

    Resin anchored rock bolts are an effective tool to control the deformation of an underground opening because they combine high support capacity with fast installation. However, there are still numerou

    Jan 1, 2006

  • SME-ICGCM
    Behavior of Welded Wire Mesh Used for Skin Control in Underground Coal Mines

    By Murali M. Gadde

    Welded wire mesh is the most commonly used skin control technique in the United States underground coal mines. Currently, selection of the mesh is based on trial and error rather than any rigorous des

    Jan 1, 2006

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • SME-ICGCM
    Recent Trends of Coal and Gas Outburst Accidents in China

    By Ming Ju Liu

    China has been suffering from the most serious coal and gas outburst accidents. The situation has become worse than ever with the mining of deeper coal seams at higher production rates in a more compl

    Jan 1, 2008

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • SME-ICGCM
    Electrical Measurements of Coal Measure Rocks for Electromagnetic Applications in Mining Industry

    By Nikolay Boykov

    Subsurface imaging technologies are part of the electromagnetic (EM) geophysical methods. EM technologies such as radio imaging method (RIM), ground penetrating radar (GPR), and drill string radar (DS

    Jan 1, 2006

  • SME-ICGCM
    Mitigating Longwall Subsidence Effects on a Large Industrial Building

    By Yi Luo

    The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ

    Jan 1, 2005

  • SME-ICGCM
    Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations

    By Kristineq Pankow

    The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th

    Jan 1, 2008

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME-ICGCM
    Roof Falls: An Inherent Risk In Underground Coal Mining (656e7541-42e3-48b1-8edc-4e23e6c7b7b1)

    By Kourosh Shahriar

    The occurrence of rock falls in underground coal mines entails detrimental effects as fatal or non-fatal injuries on workers, stoppages in mining operations and breakdown of equipment. In this paper,

    Jan 1, 2009

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    Introduction of Long, High Capacity, Highly Tensioned, Post- Grouted Cable Bolts at BHP Billiton?s San Juan Mine,

    By James Pile

    Long, high capacity, highly tensioned, cable bolts (strand bolts), stiff enough to be installed with resin like a solid bolt, yet flexible enough to be used in any lengths, have been widely used in

    Jan 1, 2007

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland

    By Andrew P. Schissler

    The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan

    Jan 1, 2012