Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems

    By John D. VandeKraats

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling

    Jan 1, 1996

  • SME-ICGCM
    How Interface Friction and W/H Ratio Affect the Mode of Failure of Coal Specimens

    By Syd Peng, Gamal Rashed

    "Bumps in coal mines have been recognized as a major hazard for many years. These sudden violent failures around mine openings have compromised safety, ventilation and access to mine workings. Previou

    Jan 1, 2015

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    Application Of Physical And Mathematical Modelling In Underground Excavations

    The scope of this paper is to introduce a mathematical model based on matrix algebra in order to determine similitude quantities, which can be arranged in specific formats to simulate the field condit

    Jan 1, 1989

  • SME-ICGCM
    Direct determination of failure surfaces in earth slopes

    By S. L. Huang

    The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer

    Jan 1, 1989

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    Birth Of A Longwall-Initial Planning To Post-Subsidence Mitigation

    By E. D. Doney

    The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort

    Jan 1, 1990

  • SME-ICGCM
    Test Method for Assessing Water Degradation Potential of Coal Measure Rocks for Analyses of Floor, Roof, and Ribs

    By G. J. Hasenfus

    There are no known published methods of estimating the degradation of coal measure rocks by water that are simple and efficient, yet still provide a quantitative, meaningful value for assessing the st

    Jan 1, 2005

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

    By Yoginder P. Chugh

    Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid

    Jan 1, 1989

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United Kingdom

    By Paul N. Freeman

    This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe

    Jan 1, 1992