Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Subsidence and Uplift Prediction in German and Polish Hard Coal Mining

    By Axel Preusse

    For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam

    Jan 1, 2012

  • SME-ICGCM
    Identifying Moisture Sensitive Roof Rocks in Coal Mines

    By Gregory M. Molinda

    Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M

    Jan 1, 2006

  • SME-ICGCM
    Control of Hard-to-Collapse Massive Roofs in Longwall Faces Using a Hydraulic Fracturing Technique

    By Hideki Shimando

    Periodic weighting and windblast which are caused by the dynamic effects of overburden in a longwall panel significantly affect longwall mining This study describes past experience with wind blast

    Jan 1, 1998

  • SME-ICGCM
    Managing A New Technology - An Update Of The UK Rockbolting Story

    By L. R. Stace

    Arguably, one of the most significant technological breakthroughs that had been experienced during the period when British Coal was the major coalmine operating company in the UK, the use of rockbolts

    Jan 1, 1996

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Application Of Computer Programs For Rock Pressure Control

    By V. M. Shick

    For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr

    Jan 1, 1996

  • SME-ICGCM
    Effects Of Subsidence On Steep Topography And Cliff Lines

    By Don Kay

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,

    Jan 1, 1992

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    Effect Of Specimen Size On Compressive Strength Of Coal

    By A. W. Khair

    Laboratory studies indicate that the specimen size influences the compressive strength of coal significantly. In the past, the diameter/height ratio of coal and rock specimens with different geometry

    Jan 1, 1996

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • SME-ICGCM
    Jenmmar Compression Roof Control System

    By John C. Stankus

    To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves

    Jan 1, 1990

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    Technical Assessment of Subsequent Burdens due to Hard Coal Mining

    By Axel Preusse

    On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man

    Jan 1, 2008

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994