Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i
Jan 1, 2009
-
Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United KingdomBy Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler
National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci
Jan 1, 2007
-
Events leading to Colombia’s Ruiz volcano eruption and its results describedBy Antonio Rivera
On Nov. 13, 1985, Colombia's Ruiz volcano erupted, killing an estimated 25,000 people and burying several villages. Damages were estimated to be about $US300 million. The following is an accou
Jan 2, 1986
-
Reproducibility Of Bond Work Index With Different Standard Ball MillsBy P. C. Fletcher, E. Kaya
The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o
Jan 1, 2002
-
Satellite Remote Sensing-Based Estimates Of Biomass Production On Reclaimed Coal MinesRemote sensing methods have been used to evaluate vegetative growth patterns for many applications, though relatively little work has focused on tracking mine reclamation progress. For coal mines in C
Feb 27, 2013
-
The Optimum Production Equipment Scale For Open Pit Coal MiningThe trend for using larger equipment in open pit mining to achieve cost effectiveness raises the question about the optimum economic point of scale in the current world of globalization. The present p
Jan 1, 2004
-
Carbon Black Production From Waste TiresBy B. P. Faulkner, M. Weinecke
Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches
Jan 1, 2001
-
Application Of Lightweight Beds For Haul Trucks At Lone Tree Mine (Doing More With Less)By T. Mills, M. Evatz
Newmont’s Lone Tree Mine, located in northern Nevada, is an open pit gold operation supported by a standard truck and shovel mine production fleet (Caterpillar 785Bs and Hitachi EXs). Newmont continu
Jan 1, 2001
-
Cyanide Leach Process Bans: The Technical SideBy C. A. Young
Cyanide is a fast-acting, highly toxic substance but, at the same time, is deemed essential for sustaining life as well as our standard of living. In this manuscript, the facts about cyanide are pres
Jan 1, 2001
-
Performance Evaluation Of Modified Biopolymers As Acid Suppressants In Copper Electrowinning - Sme Annual Conference 2023By M. Ribeiro, P. So, P. Wong
Electrowinning is a process by which metals, such as copper or nickel, are recovered from aqueous electrolyte solutions resulting from the extraction of the metal ion from an acidic or basic leach sol
Feb 1, 2023
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case StudyBy Y. Q. Zhang, S. S. Peng
Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st
Jan 1, 2004
-
Proactive Approach To Addressing Environmental Concerns For Tunneling Under AustinBy Ray Brainard
The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot
Jan 1, 2012
-
Surface ExtractionBy Christopher J. Bise
INTRODUCTION The level of analysis for the selection of extraction practices and equipment for surface mining differs significantly from that found in underground mining. In underground mines, manuf
Jan 1, 1986
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Mineral resources policies and governance in IndonesiaBy G. Tiess, S. Mujiyanto
Indonesia is a fast growing democratic developing country comprising more than 17,000 islands, founding member of ASEAN and a member of the G-20 major economies. It is one of the most highly mineralis
Jan 1, 2011
-
Removal Of Dolomite From Phosphatic OreBy Mengxiong Guo, Xuxin Shao
The recent depressant research is summarized, and a new kind of depressant (SCO) has been put forward in this article. Using Na-oleate as a collector and SCO as a depressant, separation of dolomite an
Jan 1, 1989
-
New Application Of Organic Coating To Existing Ground Support Products - Preprint 09-107By M. Slatter
The need for anti-corrosion coatings has existed for many years in the ground support industry, but the application requirements have made coating selection limited. Varying groundwater and chemical
Jan 1, 2009
-
A CFD Analysis Of Air Flow Patterns In Face Area For Continous Miner Making A Right Turn CutBy V. K. Kollipara
Air flow patterns in the face area of a room-and-pillar mining are critical for understanding the dust dispersion characteristics and for developing engineering controls. SIUC has previously performed