Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Safe Blasting Parameters And Seismic Influences During Construction Blasting

    By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek

    The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,

    Jan 1, 2009

  • ISEE
    A Blasting Efficiency Descriptor "Bed" (for surface blasting)

    By Evan Jannoulakis, Wilfrid Comeau

    Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten

    Jan 1, 1998

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    The Influence of Blast Fragmentation on Loadability in Sublevel Caving

    By Daniel Johansson, Markus Danielsson, Håkan Schunnesson

    In sublevel caving, blasted material flows gravitationally into the drawpoint from above in a periodical manner. This type of flow behavior entails muck pile conditions that are variable along the cou

    Jan 1, 2018

  • ISEE
    Application of Differential Blasting for Value Chain Optimisation

    By Stephen Mansfield, Saran Sankar

    The Sentinel open pit copper mine, operated by First Quantum Minerals Ltd, is located in the North West province of Zambia. The Sentinel orebody is a sediment-hosted, structurally modified deposit in

    Jan 21, 2025

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Predicting Vibration Through Linear-Regression Modelling

    By Anthony Konya, Calvin J. Konya

    The publication, RI8507, from the U.S. Bureau of Mines established an envelope equation that related scaled-distance to peak particle velocity in an attempt to predict ground vibration in the design p

    Jan 1, 2018

  • ISEE
    Natural Cavities in Iron Ore Deposits in Brazilian Northern Region: Challenges and Strategies

    By Anderson Meireles, Leonardo Soares Chaves, Raul Carretero Hoz, Carlos Eduardo Soares Feliciano, Renato Jacome Costa

    The large iron deposits in the northern region of Brazil located in the Amazon Craton have in common the presence of natural cavities. These cavities primarily occur in the upper layer of the ore body

    Jan 21, 2025

  • ISEE
    SmokeFCM: Segmentation of Quarry Blast Smoke Plumes using Self-Adaptive Weighted Fuzzy C-Means

    By E. Lentilucci, A. Dey, X. Liu, A. Datta, S. Ghosh

    The segmentation of quarry blast smoke plumes is a crucial research area that has the potential to enhance safety, environmental monitoring, object detection, and regulatory compliance in the mining i

    Jan 1, 2024

  • ISEE
    Blasting Versus Non-blasting Related Sounds in a House Near Surface Blasting

    By Braden Lusk

    A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav

    Jan 1, 2011

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Design/Build Highway Blasting - Case Study

    By Cathy Aimone-Martin, Frank Achuff

    The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i

    Jan 1, 2004

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010

  • ISEE
    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018

  • ISEE
    Implementation of a Real Time Traceability System from Mine to Plant

    By R. Ticona, J. Alarcon

    In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel

    Jan 1, 2024

  • ISEE
    Modern Underground Raise and Slot Design

    By N. Rouse

    Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the

    Jan 1, 2024