Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Using Explosive Risk Assessment Tools for Emergency Operations PlanningBy Dean Nichols, Matt Ortel
Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly
Jan 1, 2016
-
Journal: Junction Chamber Blasting November 22,1999By Edward Walter
Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m
Jan 1, 2001
-
Dynamic Stress Field around a Blast Hole – A Laboratory StudyBy R. Raghavaraju
Estimation of the dynamic stress field in terms of its amplitude and decay around a blast hole is a key input parameter in all numerical modeling and blast prediction exercises. However, there is very
Jan 1, 2014
-
Blastcad 3D - Three Dimensional Underground Blast Design SoftwareBy Patrice Favreau
In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commerical computer-aided drafting and design package (CADD). The obje
Jan 1, 1992
-
Blasting Overhangs Close to a Vibration Sensitive StructureBy R. Franfield
This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked
Jan 1, 2009
-
Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USABy Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach
Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th
Jan 1, 1997
-
Changing the Landscape of Surface Mining through Fully Wireless Initiation SystemsBy Nolan Eckroade, Nigel Pereira
Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly
-
Vibration Reduction Mechanism and Experiment of Stepped V-cut Millisecond BlastingBy Shi Hongchao, Zou Zou Xinkuan, Zhang Jichun
As drilling and blasting is carried out in an urban tunnel, which is adjacent to an existing building or structure, the balance between blasting-induced vibration reduction and drivage efficiency is a
Jan 1, 2015
-
Ground Motions from and House Response to Underground Aggregate MiningBy Professor of Civil and Environmental Engineering Northwestern University, Mike Wladron, Gordon Revey
A unique judicial opportunity allowed measurement of the response of three cracks in residential structure to blasting for underground aggregate mining. Instrumented cracks were located in the interio
Jan 1, 2007
-
Large Diameter and Deep Hole Presplitting Techniques for Safe Wall StabilityBy Sam Bang Jr, Rodney Burke
As mining progresses in the West, the depth of material has increased, making highwall stability a major factor in safety and production. The Jim Bridger Coal Mine’has made highwall stability a priori
Jan 1, 1998
-
Response of Manufactured Houses to Blast VibrationsBy Michael Mann
Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl
Jan 1, 2000
-
Ore Waste and Dilution Studies of Surface Mineral Blasting with 3D Distinct Element Heave ModelsBy Stewart A. Silling, Dale S. Preece
The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Modeling the movement of full scale blasting is no
Jan 1, 2016
-
Building the Bridge - Explosive Regulation and ApplicationBy Geraldine Woods
I work for the State of Washington as an Explosives inspector. My paper will describe the mission of the Wa. State Dept. of Labor pertaining to explosives and the regulation of explosives in the State
Jan 1, 2002
-
Subdrill – The Underutilised Blasting ParameterBy Stephen Mansfield
In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable
-
Smooth Blasting with the Electronic Delay DetonatorBy Yoshiharu Tanaka, Toshiyuki Ichijo, Masaaki Yamamoto
We utilized electronic detonators (EDs) to investigate the effect of high detonator delay accuracy on overbreak, remaining rock damage, and surface smoothness, in comparison with that of long-period d
Jan 1, 1995
-
Strategic Public Relations for Underground Conservatory at Tennessee Governor’s ResidenceBy Jake Hutchison, Wade Hutchison
The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro
Jan 1, 2009
-
Investigation into Monitoring of Initiator PerformanceBy Charles Deacon
The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more
Jan 1, 2000
-
Expansion of the Panama CanalBy Tom Treleaven
The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has
Jan 1, 1997
-
Report on the New Risk Criteria Proposed by the RCC Risk CommitteeBy Tom Pfitzer, Alice Correa, Meredith Hardwick
The past decade has brought significant changes in the use of risk-based criteria for safety within the U.S. Department of Defense. The Range Commanders Council (RCC) chartered a working group to deve
Jan 1, 2007
-
The Computerized Design Program for Tunnel BlastingBy Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005