Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Engineering techniques to optimize an Arctic mine

    By Alan E. Renshaw

    "This paper is a practical overview of ways to reduce cost in the design and operation of an Arctic mine. The economically important issues of the Arctic mine that will be addressed include: permafros

    Jan 1, 1996

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • CIM
    Spray Drying of Mineral Concentrates

    By R. J. MacLeod

    "INTRODUCTIONThe removal of water or liquid from slurries and solutions is a procedure generally present in many process industries. This has prompted the development of many mechanical and thermal de

    Jan 1, 1972

  • CIM
    Influence of hydrogen peroxide addition on the corrosion of carbon steel by concentrated sulphuric acid

    By C. M. Davidson, D. J. Drexler

    "Sulphuric acid treated with hydrogen peroxide to destroy organic contaminants could conceivably show increased corrosivity toward carbon steel shipping and storage vessels, caused by the persistence

    Jan 1, 1987

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Role of Some Organic Impurities in Zinc Electrowinning: Adverse Effects on Current Efficiency and Product Quality

    By E. L. C. Martins, M. J. Nicol, D. Majuste, A. D. Souza

    The effects of organic compounds on the current efficiency (CE), morphology, crystal structure and mechanical properties of the metal deposited during the electrowinning of zinc are described. A flota

    Jan 1, 2014

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Contrasting Kimberlite Types and Dispersion Trains at the Churchill Diamond Project, Kivalliq Region, Nunavut

    By P. Strand

    Talk Outline ? Location and Regional Geology ? Two Unique Kimberlite Sources ? Mineral Chemistry ? Petrography, Age Dates ? Geophysics ? Exploration and Challenges ? Dyke versus Pipe dispersion

    May 1, 2008

  • CIM
    Effect of some rock mass properties on blasting-induced ground vibration wave characteristics

    By H. A. Bilgin, G. G. U. Aldas

    "Ground vibration is the natural result of the blasting process. Many empirical formulae and methodologies including analysis of travel path effects have been developed. The scaled distance, which is

    Jan 1, 2004

  • CIM
    Sub-aqueous Inpit Deposition of Uranium Tailings at Key Lake

    By Trevor Hamm, Nick Holl

    "Cameco Corporation is operator of the world's richest uranium project, the Key Lake mine/mill complex, located within the Athabasca region of Northern Saskatchewan. Mineable resources from the Key La

    Jan 1, 1998

  • CIM
    Development of Cable-Lok Anchor for Pre-stressed Cable Bolting and its Applications in Mines

    By Rocky (Yaokun) Wu

    This paper introduces the development and application of a new cable anchor - Cable-Lok for pre-stressed cable bolting in mines. Cable-Lok is a spring-loaded cable anchor suitable for the drill hole

    Oct 1, 2010

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Decision Support Programs

    By Hamid Butt

    Information Technology ??Advanced Information Technology is dramatically changing information flow within organizations. This enables employees to have information at their fingertips to make informe

    May 1, 2006

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

    By Brad Thrall, Howard Bradley, Michael Samuels

    "LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondi

    Jan 1, 1999

  • CIM
    Les Mines Selbaie Story Geology

    By J. J. Bouillon

    "Located in the northwestern portion of the Abitibi greenstone belt, Les Mines Selbaie is a copper-zinc (silver and gold) producer. Felsic tuffs host three are zones. Composed of sulphide veins and br

    Jan 1, 1990

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004