Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Residue Treatment Plant Practice at Risdon, TasmaniaBy Garrigan J. S, Oakes I
Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl
Jan 1, 1977
-
The Changing Influences on the Economics of Developing New Underground Coal Mines in New South WalesThis paper examines the cost and economic consequences of varying a number of key factors in the course of developing and operating new underground longwall coal mines with both shallow and deep cov
Jan 1, 1988
-
Western Deep Levels South - A Technical ChallengeBy Lloyd F, Bayley F. J
The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦
Jan 1, 1988
-
Application of Knowledge Based Expert Systems in the Mining IndustryExpert systems are a product of Artificial Intelligence (AI), a field of long standing, dedicated to the study of problem solving using heuristics, construction of symbolic representations of knowl
Jan 1, 1998
-
Risk Assessment for New Technology in the Open Cut - Wambo DraglineBy Lumley G. I, Duffy W. J
The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be
Jan 1, 1992
-
Expert Control at Boddington Gold MineBy Green S, McKernan, Skrypniuk
In November 1996, Boddington Gold Mine (BGM) began the implementation of an expert system. The objective of the expert system was to improve plant efficiency by developing an `operator best practice
Jan 1, 1997
-
Use and Performance of Bucketwheel Excavators in the Latrobe Valley CoalfieldsBy Laird CH
Large quantities of brown coal are excava ted from open cut mines in the Latrobe Valley to fire the base load thermal power stations of the Victorian Electricity System. Most of the coal is removed
Jan 1, 1978
-
The Design and Development of a Laboratory Scale Solvent Extraction ApparatusBy Brady KT, Pattenden G
A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u
Jan 1, 1984
-
Activity Models for Pyrometallurgical Processes Using STEPSOLBy Morris A. E
The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, th
Jan 1, 1991
-
Activity Models for Pyrometallurgical Processes Using STEPSOLBy Morris A. E
The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, the
Jan 1, 1992
-
The Physical Structure of Cast Iron and Its Relation to Cupola PracticeIT is very difficult for a founder engaged in jobbing work, comprising all sizes and classes of castings, to appreciate that the analysis of the iron he is using cannot entirely fill the situation he
Jan 1, 1926
-
Carbon Desorption Process Development at Micron Research (Western Australia)By Costello MC
An alternative process for desorbing and recovering metals from activated carbon has been developed, and is the subject of several patent applications by Micron Research (W.A.) The system uses the pr
Jan 1, 1982
-
Risk Management of a Gold Heap Leach ProjectOne of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This p
Jan 1, 1994
-
Virtual Hailage Trucks: Improving the Safety of Surface MinesBy Denby B, Hollands R. Schofield D
Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th
Jan 1, 1998
-
Explosives Performance - Who Needs to Know?The Australian bulk explosives industry has matured significantly over the last five years and it would appear that the rest of the world is following suit. This maturity is characterised by the te
Jan 1, 1990
-
Flotation in the Warrego Concentrator of Peko Mines Ltd.By Lynch AJ, Musgrove NH
The behaviour of chalcopyrite and pyrite in the rougher-scavenger and regrind-retreatment circuits in the Warrego concentrator is discussed. The effects of change in xanthate addition on the separ
Jan 1, 1975
-
The Application of Spectrometric Coal Lithology Logging in Brown Coal MiningBy Smith Z, Huppert P, Charbucinski J
The paper describes a spectrometric method and apparatus developed for lithology logging in brown coal formations. The nuclear spectromet- ric technique developed is able to delineate coal/sand/clay
Jan 1, 1989
-
Grade Control - A Continuing Exercise in Quality Management(Quality can be defined as that which is acceptable to the market and can be supplied with a predictable degree of uniformity and dependability at a low cost. The market for any mining product is down
Jan 1, 1992
-
An Exploratory Study Of Pre-Nucleated PelletisationBy Adamiak Z. P, Nicol S. K
An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared
Jan 1, 1974
-
The Application of SimulationTechnology to Enchance Operator PerformanceBy Morrison RD, Peberdy NJ
Simulator training provides a cost effective method of training operators in both the process and control aspects of a metallurgical plant. The components and requirements of a training simulator ar
Jan 1, 1991