Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham Resources

    By I Villalba

    The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a

    Nov 8, 2011

  • AUSIMM
    The Influence of Pyrite on Galena Oxidation and Subsequent Flotation

    Folklore suggests that oxidation is detrimental to sulfide mineral flotation, and in many instances is the reason given for values reporting in the tailing. However, while a considerable body of work

    Jan 1, 2005

  • AUSIMM
    Dephosphorisation of Stainless Steel Using BaCO3 - CaO - BaCl2 - Fe2O3 Fluxes

    By Vilela A. C F

    In the present work, the process of dephosphorisation of stainless steel was developed in laboratory scale by adopting a high frequence induction furnace, using BaCO3 base flux. By using BaCO3 - CaO

    Jan 1, 1991

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    Technology of Dust Suppression by Foam for Fully Mechanised Heading Face

    By H Wang, D Wang

    Mine dust is the most serious occupation hazard in coalmines. And many coal workers suffer from pneumoconiosis because of long-term inhalation of respirable dust. Reducing the dust concentration of wo

    Aug 31, 2015

  • AUSIMM
    Review of Analytical Methods for Determining Trace Amounts of Gold in Ores and Process Streams

    The accurate determination of trace level gold in ores, metallurgical samples and process solutions is required because of the value of gold, the efficiency of the cyanide leach process and because

    Jan 1, 1982

  • AUSIMM
    Electric-Hydraulic Drilling at Mount Isa Mines Limited

    Since 1975 two electric hydraulic drills, a Robbins 11ND and an Atlas Copco C0P1038, have been part of the production drilling fleet at Mount Isa Mines Limited's Isa Mine. As might be expecte

    Jan 1, 1978

  • AUSIMM
    Metallurgical Operations at the Yabulu Nickel Refinery of Queensland Nickel Pyt. Ltd.

    Geologists employed by Metals Exploration Pty. Ltd. discovered nickel enrichment at Greenvale, 180 kilometres West of Townsville, in 1967. Subsequent drilling proved an ore body containing 45 milli

    Jan 1, 1978

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding Properties

    By Giles C. N, Loughnan F. C

    Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i

    Jan 1, 1959

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agents

    By F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld

    The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches

    Jun 19, 2024

  • AUSIMM
    Effects of Open Fire on Ventilation in Coal Mines

    By S K. Ray

    Open fire in a mine gallery causes large-scale damage to property and sometimes precious lives. Such fires produce two distinct effects, the throttle effect and the buoyancy effect. These effects dist

    Jan 1, 2005

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    Filtered tailings – an iron ore experience

    By L Vimercati, R Williams

    Transitioning to a green future requires the mining industry to adopt sustainable practices. Filtered tailings are become a key expectation of the communities we operate in and are growing in a number

    Sep 18, 2023

  • AUSIMM
    Sampling in Block Cave Mines

    By I T. Ross

    Sampling drawpoints in block cave mines has been a contentious issue for many years. Doubts have been expressed as to the validity of the process used at most mines. This paper outlines the sampling p

    Aug 21, 2012

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Spatial Planning and Interface Issues for Mechanical and Electrical Facilities in Road Tunnels

    Mechanical and electrical (M&E) systems in road tunnels are constrained by the traffic envelope and the construction profile. Whilst these spatial constraints are often ælocked inÆ early in the de

    Jan 1, 1999