Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case Study

    By A J. Daniels

    Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p

    Aug 22, 2011

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Bulk Solids Sampling

    By J E. Powalisz

    Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to

    Jul 29, 2014

  • AUSIMM
    The Development of ‘Radial-in-Reef’ Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania

    By R Goddard

    An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as ‘Radial-in-Reef’ (RiR) stoping, the method employs the drill

    Mar 21, 2011

  • AUSIMM
    A View of Commodity Agreements

    For the last 4 years political leaders have found a new subject on which they can safely generalize wihout creating opposition. That sub- ject is commodity prices. Since the four-fold increase in O

    Jan 1, 1978

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    The Edie Creek Vein System and Bulolo Graben

    By Corbett GJ

    The Bulolo Graben represents an intra-arc rift formed by activa- tion of transfer structures in an extensional setting formed be- tween the eastern and western sectors of the New Guinea Origin. Crust

    Jan 1, 1997

  • AUSIMM
    Trucking, Rail or Conveyor?

    By R B. Venugopal, P Staples

    The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m

    Jan 1, 2005

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    An evolution of drill hole spacing studies at Newmont Corporation

    By A Jewbali, L Allen

    At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)

    May 24, 2023

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Geometallurgy – Back to the Future: Scoping and Communicating Geomet Programs

    By J Jackson

    The term geometallurgy (or geometallurgical) first appeared in the literature some 40 years ago and has a wide range of definitions and perspectives which increases the barriers of communication betwe

    Sep 5, 2011

  • AUSIMM
    A Systems Approach for the Application of Eco-Efficiency Indicators for Process Design in the Minerals Industry

    By H von Blottnitz, J L. Broadhurst

    Eco-efficiency has been proposed by the World Business Council on Sustainable Development as an environmental performance indicator framework that contributes to sustainability by assisting corporate

    Jan 1, 2009

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023