Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Transfer Function – New Method to Accurately Predict Resonant Frequencies of a Highwall

    By R Osterman

    As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw

    Aug 24, 2015

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Channel Iron Deposits - A Major New District Around the Caliwingina Creek, Central Hamersley Ranges,Western Australia

    By T Gill, A Faragher, B Scott, V Kakebeeke

    In 2000, after six year intensive exploration for high-grade haematite deposits, Rio Tinto included the channel iron deposits (CID) as a specific iron ore target in the Hamersley Province iron ore exp

    Jan 1, 2009

  • AUSIMM
    Phanerozoic Ooidal Ironstone Deposits - Generation of Potential Exploration Targets

    By E R. Ramanaidou, M Wells

    The aim of this paper is to summarise all known Phanerozoic ooidal ironstone deposits worldwide, including Australian deposits such as the well-known channel iron deposits (CID). Nearly 400 occurrence

    Jan 1, 2009

  • AUSIMM
    A Novel Approach to the Characterisation of Iron Ores and Concentrates Using Recent Advancements in Wavelength- and Energy-dispersive X-ray Fluorescence Spectrometers

    By M Rayner, C Tsouris, A Komelkov

    X-ray fluorescence (XRF) is a widely accepted technique for the elemental analysis of iron ores and their concentrates. Wavelength-dispersive, or WDXRF, and energy-dispersive, or EDXRF, spectrometers

    Jul 13, 2015

  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • AUSIMM
    Fractals and Spatial Geometry - An Application to Veins in the Otago Schist

    Most people are familiar with Euclidean dimensions: zero for a point; one for a line; two for a plane; and three for a volume. Howeverbobjects are not actually Euclidean, but lie somewhere between Euc

    Jan 1, 1992

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014

  • AUSIMM
    Ventilation Considerations for the New Level Mine Project Access Tunnels

    By E Acu±a, B Prosser, R Alvarez, K Wallace

    This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti

    Jul 1, 2013

  • AUSIMM
    Methodology development of electrical conductivity measurements for non-ferrous slags

    By L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens

    As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco

    Jun 19, 2024

  • AUSIMM
    The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East Pilbara

    By R McCarthy, P Darvall

    FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral

    Jan 1, 2009

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing

    By A Bennett, S Arndt

    Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min

    Mar 24, 2014

  • AUSIMM
    VertiMill® Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP Billiton

    By J Allen, B Oats, S Palaniandy, M Lollback

    The Julius Kruttschnitt Mineral Research Centre has conducted an intensive VertiMill® (VTM) survey program at the Cannington mine concentrator as part of the ‘collaborative research in stirred milling

    Sep 1, 2014

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    Permitting in the face of uncertainty – how to deliver confidence to regulators and investors

    By R L. Grogan

    Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method

    Jul 25, 2018

  • AUSIMM
    The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western Australia

    By T Wellman, G Sternadt, R Hingston

    The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos

    Aug 18, 2014