Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geometallurgical sampling protocol validation by bulk sampling in a sheeted vein gold deposit

    By Y Xie, L O’Connor, S C. Dominy

    Sheeted vein gold deposits are characterised by multiple subparallel veins and often free milling gold. Variability in gold grade and recovery parameters are enhanced by poorly designed sampling and t

    May 9, 2017

  • AUSIMM
    Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure

    By P Audet, D Doley

    The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc

    Jul 16, 2014

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    How to select appropriate instrumentation to safeguard TSFs against credible failure modes

    By P J. Chapman

    Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to

    Jul 1, 2021

  • AUSIMM
    An Environmental Assessment of Lead and Zinc Production Processes

    By W J. Rankin

    A study was carried out to compare the environmental impacts of a number of process routes for lead and zinc metal production from sulphide ores using Life Cycle Assessment methodology and based on av

    Jan 1, 2002

  • AUSIMM
    Measuring the Influence of Sample Size on the Precision and Accuracy of Gravity Gold Estimation

    By A Giblett, T J. Napier-Munn

    This paper presents the results of a test program evaluating the impact of sample mass on the precision of Stage 1 gravity recoverable gold (GRG) test results. Four ore types ranging from low to high

    Sep 7, 2015

  • AUSIMM
    JORC and Mineral Resource Classification Systems

    The JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in

    Sep 26, 2011

  • AUSIMM
    Surface Chemistry of Iron Ore Throughout a Processing Plant

    Surface Chemistry of Iron Ore Throughout a Processing Plant

    Sep 13, 2010

  • AUSIMM
    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Sep 13, 2010

  • AUSIMM
    Forum: The Role of Government Departments in the Minerals Industry

    I am wearing two hats today. When the invitations went out to participate in this forum, two were received in the head office of the Department of Lands and Survey - one addressed to the Director-Gene

    Jan 1, 1976

  • AUSIMM
    Is Measuring pH Enough?

    By J Kinal, I Mitchell

    Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased

    Jan 1, 2006

  • AUSIMM
    Sampling and Weighing

    I have chosen this subject in view of the fact that, while there are many and ample opportuuities of getting reliable assays made, there are but few who are in a position to obtain reliable data on th

    Jan 1, 1901

  • AUSIMM
    Circular Tunnelling

    The work described herein is the opening phase of an extensive system of underground excavation undertaken under contract with a Malayan authority.The specifications called for the lining of all tunne

    Jan 1, 1941

  • AUSIMM
    Zero Base Design and Risk Mitigation

    This paper examines the integration of risk management into the design philosophy of a project to produce a æzero baseÆ design, which targets a minimum capital cost without adversely impacting upon th

    Jan 1, 2004

  • AUSIMM
    Philosophy of Slope Design: A Case Study of Geotechnical Investigations at Macraes Flat Gold Mine

    Site specific geotechnical data, deposit characteristics and method of mining are key factors when assessing an appropriate slope design philosophy. Mining geotechnics should be viewed as an iterative

    Jan 1, 1992

  • AUSIMM
    This Life of Mine - Personal Reflections on The Well-Being of the Contracted Fly-In, Fly-Out Workforce

    By R Goater, P Kirsch, S Goater, I Goater

    With staff productivity and retention a crucial factor in the longevity of AustraliaÆs mining industry, some mining companies are increasing their focus on the health and well-being of their people, t

    Sep 18, 2012

  • AUSIMM
    Main Events in the History of Mineral and Energy Resource Development in New Zealand

    By A B. Christie, R L. Brathwaite

    Since the first occupation of New Zealand in 800 - 900 AD, various useful minerals, rocks, and energy resources have been identified and extracted. The Maori prized greenstone for ornaments, tool

    Jan 1, 1993

  • AUSIMM
    Tectonic Controls of Geochemical Evolution in Arc Magmatism of SE Asia

    By R Hall

    Subduction zone magmatism is a direct response to tectonic and chemical processes operating at convergent margins. Changes in the tectonic configuration of plate boundaries in SE Asia during the Cenoz

    Jan 1, 1999

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015