Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Quality Standards with Reference to the Mining Industry in New Zealand

    Water quality standards for some of the substances likely to be discharged to natural waters by the mining industry are discussed. After briefly examining how uses of water can be affected by discharg

    Jan 1, 1986

  • AUSIMM
    Study on Flotation Experiment of Complex Copper-Lead-Zinc Polymetallic Sulfide Ore in High Altitude Area and its Industrial Application

    Study on Flotation Experiment of Complex Copper-Lead-Zinc Polymetallic Sulfide Ore in High Altitude Area and its Industrial Application

    Sep 13, 2010

  • AUSIMM
    SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions

    By W Curlewis, D Hake, Z Cuthbert

    The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int

    Sep 17, 2014

  • AUSIMM
    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Sep 13, 2010

  • AUSIMM
    Some Features of Lead Blast-Furnace Operations at the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie, S.A.

    The discussion which followed the publication of my paper by the formert has, I think, enhanced its value. It may therefore be of interest to members of our Australasian Institute, who are not members

    Jan 1, 1932

  • AUSIMM
    Carbon Prefloat Improvements at Century Mine

    By D G. Rantucci

    Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions

    Aug 8, 2011

  • AUSIMM
    Timing of Epithermal Activity in the Horohoro-Matahana Basin Area, Taupo Volcanic Zone

    By P J. B Fransen

    Several spatially and/or temporally distinct phases of epithermal activity can be recognised in the Horohoro-Matahana Basin area of the Taupo Volcanic Zone. In the northern Matahana Basin a 140 - 350

    Jan 1, 1991

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Learning to Love Uncertainty

    Exploring long-term future possibilities for your business and methods for achieving them are critical functions of leadership. More than ever, strategic initiatives today have to be planned and deliv

    Jan 1, 2006

  • AUSIMM
    Discovery of the High-Grade Gold Link Zone at Wafi, PNG

    By A Vigar

    Siliceous float sampled in the Wafi River by CRA Exploration in 1977 assayed 22 g/t Au and 89 g/t Ag. Follow up in 1979 led to the discovery of outcropping mineralisation now known as Zone A. Soil sam

    Jan 1, 1999

  • AUSIMM
    Understanding Rock Mass Behaviour through the Development of an Integrated Sensing Platform

    By E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez

    This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl

    May 9, 2016

  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
    Why Do We Invest in New Technology in the Mining Industry?

    Thank you for the invitation to address The AusIMM Young LeadersÆ Conference here today. When I first saw the conference theme û æadvancing technologies and their future applications in the mining ind

    Jan 1, 2003

  • AUSIMM
    Planning for Rehabilitation of Lands Disturbed by Alluvial Gold Mining on the West Coast

    By A Tinnelly

    Land disturbed by alluvial gold mining should be restored to a capability or productivity as good as that which existed prior to disturbance.   Effective rehabilitation requires detailed planning

    Jan 1, 1989

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    World-Class IOCG Deposits and Potential Deposits in South Australia

    By P S. Heithersay, M McGeough

    The discovery of Olympic Dam in 1975 and, more recently, Prominent Hill in 2001 and Carrapateena in 2005 demonstrates the potential for world-class IOCG deposits in South Australia. Potential for furt

    Jan 1, 2007