Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Removal of As(III) and As(V) in Aqueous Solution
Removal of As(III) and As(V) in Aqueous Solution There are toxic arsenical species such as As(III) and As(V), and arsenious species have specially strong toxicity. The strong toxicity causes contamin
Sep 13, 2010
-
Modelling and Optimisation of Direct Reduction of Iron Ore by Coal in a Rotary Kiln
Modelling and Optimisation of Direct Reduction of Iron Ore by Coal in a Rotary Kiln
Sep 13, 2010
-
Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes
By M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005
-
The Orogenic Gold Deposit Model and New Zealand: Consistencies and Anomalies
By A B. Christie, F P. Bierlein
Lode gold deposits of the Western and Eastern provinces, South Island, New Zealand , formed as a part of the Cordilleran-st
Jan 1, 2005
-
The Nokomai Gold Mining Project
By G Boyd
The Nokomai Gold Mining Project commenced production in January 1992. The Project continues a history of mining in theNokomai Valley which extended from 1863 to 1942. L & M Mining Limited have hel
Jan 1, 1992
-
A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation
By B Reid
"Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This
Nov 15, 2016
-
Orepass Loss Mitigation Approach in Malmberget Mine
By A Salama, J Greberg, B Skawina
In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of
May 9, 2016
-
The Importance of Data Collection to the Blasting Process
By J Hutchings
An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat
Nov 8, 2011
-
Can æNovelÆ Ecosystems Offer Suitable Rehabilitation Alternatives for Post-Mined Landscapes?
By P Audet, D R. Mulligan, D Doley
This analysis attempts to reconcile existing ecological theories, rehabilitation planning goals and implementation constraints in the form of a rehabilitation paradigm that considers potential and pra
Jul 10, 2012
-
Stream Ecology and Acid Mine Drainage - Ecosystem Degradation, Recovery and Remediation
concentrations) and physical nature of receiving streams, which in turn affects the stream ecosystem. Benthic macroinvertebrates are used to illustrate these impacts, and to investigate natural recove
Jan 1, 2003
-
Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA
By W L. Daniels, C Stilson, C Zimmerman
Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car
Jul 10, 2012
-
An Assessment of Radioactivity Hazards at a Proposed Heavy Mineral Sand Mining Site
By N E. Whitehead
An application to mine an ilmenite-rich sand deposit in Westland led to public concern about potential radioactive hazards should the ore be further processed to recover zircon or monazite. A review r
Jan 1, 1993
-
Aluminium Recovery from Water Treatment Plant: A Contribution to the Self-Sustainability of the Water Treatment Process
By F H. S dosSantos, R L. C Santos
The main objective of this work was to develop, at a laboratory scale, a process for treating residues from the settling stage of water treatment so as to remove and recover the aluminium as sulphate.
Jan 1, 2002
-
Maximising asset value through optimal block by block decisions on marginal material
By F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
Aligning Resource Estimates with Mine Planning
By D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
A Rapid and Cost-Effective Method for Bench Screening of Geochemical Performance and Disposal Options for High-Sulfide Tailings
By M Logsdon, B Johnson, M Fordham
The underground Neves Corvo copper-tin mine in southern Portugal currently disposes of its tailings in a ætraditionalÆ wet tailings impoundment. With the development of new technologies for preparatio
Jan 1, 2003
-
Preparation of MgO Nano-Particles with Magnesite
Preparation of MgO Nano-Particles with Magnesite
Sep 13, 2010
-
Design and testing of high capacity surface support
By T Roberts, S Talu
Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre
Nov 30, 2018
-
Direct observation of the fayalite slag formation behaviour from large SiO2 grains
By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami
The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea
Jun 19, 2024
-
Enhancing Zircon (ZrSiO<sub>4</sub>) Dissolution by Ambient Temperature Processing
The dissolution of the naturally occurring mineral zircon (ZrSiO4) is examined after ball milling it with magnesium oxide for up to 100 hours in a laboratory mill. There was little effect on the solub
Jan 1, 2000