Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Refining Processes at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    The following paper describes the refining practice for the production of lead, silver and gold at the works of The Broken Hill Associated Smelters Pty. Ltd., Port Pirie, South Australia.The refinery

    Jan 1, 1937

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Regulating radiation exposures from naturally occurring radionuclides in the WA mining industry

    By J Koshy, M Ralph, P Foley

    Mining in the state of Western Australia (WA) formally commenced in the 1840s, and over the ensuing 180 years has evolved to be the epicentre of the Australian mining industry and a significant contri

    Apr 16, 2024

  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    The Use of 3-D Computer Techniques for Optimal Resource Assessment and Mining - Greymouth Coal Limited

    A 3-D computerised model of the southern part of Greymouth Coal Limited's Coal Mining Licence area has recently been completed. This model, and associated 3-D CAD tools, has/is being used to opti

    Jan 1, 1996

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Tellurium in the Ores of the Hauraki Goldfields

    New Zealand has often been quoted by metallurgists and others as one of the countries in which Tellurium is found, and locally it has been recorded that appreciable quantities of tellurium have been m

    Jan 1, 1901

  • AUSIMM
    Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technology

    By B Taylor, S Evans

    Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions

    Sep 1, 2024

  • AUSIMM
    Separation of Iron Particles from Banded Haematite Quartzite (BHQ) Ore by Selective Magnetic Coating

    Separation of Iron Particles from Banded Haematite Quartzite (BHQ) Ore by Selective Magnetic Coating The separation of fine iron particles from banded hematite quartzite (BHQ) has been studied using

    Sep 13, 2010

  • AUSIMM
    Acid Mine Drainage Treatment at Herbert Stream, Stockton

    By M Watts, P Lindsay

    Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration

    Jan 1, 2007

  • AUSIMM
    Hydrotermal Alteration Zones and Sulphur Deposits in Upper Cenozoic Vocanoes of Salar De Gorbea, Andes of Northern Chile

    The segment of the Upper Cenozoic volcanic chain (CVZ) located on the western border of South America (16-28¦S lat.) is constituted by an association of strato- volcanoes and ignimbrite sheets, with

    Jan 1, 1987

  • AUSIMM
    Integrated Management in the Mining Industry

    If you are to be and remain competitive in the mining industry, it is vital that your company management systems are efficient. An integral part of today's competition in a ruthless market is to

    Jan 1, 1997

  • AUSIMM
    The Next Challenge in Optimising Mining Operations

    This paper describes the past, normal and advanced practice of optimisation in mining. It then discusses what needs to happen for the mining industry to make full use of what is now available.

    Dec 6, 2010

  • AUSIMM
    Microsilica 600 - A Natural Amorphous Silica

    By K Thorpe

    Amorphous silica deposits have been identified at Tikitere and Taheke near Rotorua. Two areas at Tikitere have been surface sampled and drilled to establish a resource of amorphous silica in excess of

    Jan 1, 1999

  • AUSIMM
    The Flotation of Alluvial Gold

    By S G. Keyte

    Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.l mm. Whereas such gold may not have been economic to recover in the past, the same may not be true t

    Jan 1, 1990

  • AUSIMM
    Adsorption of Starch on Kaolinite Surfaces

    Adsorption of Starch on Kaolinite Surfaces

    Sep 13, 2010

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005